My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Longmont WC Plan 2008
CWCB
>
Water Conservation
>
DayForward
>
Longmont WC Plan 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2015 11:23:29 AM
Creation date
11/24/2008 3:08:30 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Contract/PO #
OE PDA 08-15
Applicant
City of Longmont
Project Name
City of Longmont Water Conservation Plan
Title
City of Longmont Water Conservation Master Plan
Date
11/24/2008
County
Boulder
Water Conservation - Doc Type
Complete Plan
Document Relationships
Longmont_WCPlan_50%ProgReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WCPlan_95%ProgReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WCPlan_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WCPlan_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WEPlanUpdate_2018
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WATER CONSERVATION PLAN 2008 <br />Training programs for residential and commercial and irrigation customers, <br />Individual customer water use tracking program (including conducting a raw <br />water use audit on all relevant City facilities), <br />Water conservation public relations program complete with messaging, media <br />channel management (newspaper, television, radio), <br />CWCB grant application to initiate commercial and irrigator audit programs in <br />each of the next 4 years, and begin commercial and irrigation rebate and AMR <br />installation programs, <br />Meaningful soil amendment inspection program. <br />TABLE 18 <br />Estimated Implementation Schedule for Measures and Programs <br />Estimated Implementation <br />Time Frame <br />Measure /Program <br />2 to 3 years <br />Commercial Rainfall Sensor Rebate <br />Commercial ET Controller Rebate <br />Commercial Indoor Audits <br />Commercial /Irrigation Outdoor Audits <br />Pre -Wash Spray Nozzle Giveaway <br />Commercial ULF Toilet Rebate <br />Commercial ULF Urinal Rebate <br />Residential Rainfall Sensor Rebate <br />Residential ET Controller Rebate <br />AMR Metering (Commercial) <br />Project WET Teacher Training <br />3 to 5 years <br />Commercial and Residential Education <br />Landscaper Irrigation Contractor Training <br />Non - Potable Irrigation Upgrades /Audit <br />5 years and beyond <br />Residential Whole House Audit <br />Current and Ongoing <br />Meter Testing and Replacement <br />Residential ULF Toilet Rebates <br />Residential Outdoor Irrigation Audits <br />Residential Dish Washer Rebate <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.