My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Longmont_WCPlan_50%ProgReport
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Longmont_WCPlan_50%ProgReport
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:31:46 AM
Creation date
1/24/2008 12:32:50 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-15
Applicant
City of Longmont
Project Name
City of Longmont Water Conservation Plan
Title
50% Complete Progress Report for City of Longmont Water Conservation Plan Update
Date
1/16/2008
County
Boulder
Water Efficiency - Doc Type
Interim Reports
Document Relationships
Longmont WC Plan 2008
(Message)
Path:
\Water Conservation\DayForward
Longmont_WCPlan_Invoices
(Message)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WCPlan_PO
(Message)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Public Works and Water Utilities <br />Business ServicesJ Utilities Engineering, Water Resources & Environmental Services <br />1100 South Sherman Street <br />Longmont, CO 80501 <br />303-651-8376 · Fax: 303-651-8812 · www.ciJonqmont.co.us <br /> <br />January 16, 2008 <br /> <br /> <br />Tammie Petrone <br />CWCB,Office of Water Conservation and Drought Planning <br />Grants Coordinator <br />1313 Sherman St~ Room 721 <br />Denver, CO 80203 <br /> <br />RECEnVED <br /> <br />J A N 2, 2 2008 <br /> <br />~cJorado Water Consen'afion H:_ <br /> <br />RE: 50% Complete Progress Report for City of Longmont Water Conservation Plan Update <br /> <br />Dear Tammie, <br /> <br />Enclosed please find the progress report for the City of Longmont's Water Conservation <br />Planning Grant Program... The progress report is organized according to the requirements for <br />the 50% completion report and provides an update on progress since the project started in <br />June 2007. <br /> <br />Project Tasks Completed <br /> <br />To date foUl' of the nine planning steps for water conservation have been completed, and <br />progress has begun on two other planning steps. The four plamring steps that have been <br />completed include profiling the water system (Step 1), characterizing water use (Step 2), <br />profiling future water supply options (Step 3), and identifying water conservation goals <br />(Step 4). Progress has been made on identifying conservation. measures and programs (Step <br />5) and evaluating conservation measures and programs (Step 6). <br /> <br />Project Successes <br /> <br />Since early on in the project the team (Great Western Institute and CH2M HILL) has been <br />able to receive input from the Water Board on a regular basis by attending Water Board <br />meetings. Receiving this input at an early stage has allowed incorporation of feedback as the <br />plan is being developed and will hopefully reduce review comments on the draft plan.. The <br />Water Board is very interested in water conservation and has participated in many <br />discussions with the team. In addition to early involvement from the Water Board, the team <br />has also conducted meetings with various City departments for input including P1anning~ <br />Finance, and Parks. <br /> <br />Project Obstacles <br /> <br />There have not been any significant obstacles to date. As expected there have been some <br />challenges with gathering data from multiple department,;, but the updated conservation <br />plan will hopefully identify improvements in this area. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.