My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erie WC Plan2008
CWCB
>
Water Conservation
>
DayForward
>
Erie WC Plan2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 3:47:04 PM
Creation date
3/13/2008 3:11:00 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Applicant
Town of Erie
Project Name
Town of Erie Water Conservation Plan
Title
Erie Water Conservation Plan
Date
1/1/2008
County
Boulder
Water Conservation - Doc Type
Complete Plan
Document Relationships
Erie_WCPlan_50%PR
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Erie_WCPlan_95%PR
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Erie_WCPlan_Application
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Erie_WCPlan_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CDNI <br /> <br />Section 2 <br />Profile of Existing Water System <br /> <br />2.1.3 Existing Water Facilities <br /> <br />Erie's existing water supply consists of ditch, reservoir, Colorado Big-Thompson <br />(CBT)2, and Windy Gap3 surface water supplies. Figure 2-1 shows the location of the <br />ditches, reservoirs, potable water treatment facility, and wastewater treatment plants. <br />Raw CBT and Windy Gap water are delivered to Erie from the Northern Colorado <br />Water Conservancy District (NCWCD) via a pipeline to the potable water treatment <br />facility in the southwest portion of the service area. Erie's storage reservoirs (Erie, <br />Prince, and Thomas Reservoirs) are also in the southwest portion of the service area. <br />Raw water pipelines convey this water to the potable water treatment facility and <br />to/from Thomas Reservoir. Potable water is distributed from the water treatment <br />facility to customers. <br /> <br />The Southern Water Reclamation Facility (SWRF) near Old Town currently treats all <br />of Erie's wastewater. This facility has a capacity of 1.2 million gallons per day (mgd) <br />and is being optimized to 1.6 mgd. Treated effluent is discharged into Coal Creek. A <br />new Northern Water Reclamation Facility (NWRF), planned for 2009, will supplement <br />the SWRF's treatment capacity. <br /> <br />Table 2-2 provides a summary of Erie's water supplies, facilities, and planning efforts. <br /> <br />Table 2-2 2007 Water System Profile <br /> <br />Service Characteristics I Value <br />Estimated service population See Section 2.1.2 <br />Estimated service area 15 square miles <br />Miles of mains 153 <br />Number of treatment plants One <br />Number of wastewater treatment plants One (second plant planned for 2009) <br />Number of separate water systems None <br />Interconnection with other systems EmerQency connections with City of Lafayette & Left Hand Water District <br /> Percent <br />Annual Water Supply*,** Water Rights Yield metered <br />Potable Surface Water 5,852 AFY 1000/0 <br />Non-potable Ditch Water 1,170 AFY 1000/0 <br />Total annual water supply 7,022 AFY 1000/0 <br /> Percent <br />Type of Account/Tap Number of Accounts/Taps metered <br />Commercial 95 1000/0 <br />Irrigation 118 1000/0 <br />Residential 5,873 1000/0 <br /> <br />2 CBT water is water provided to Erie through the CBT system. This system diverts water <br />west of the Continental Divide near Grand Lake to over 30 cities and towns and for <br />irrigation of 693,000 acres on the Front Range. <br />3 Windy Gap water is water delivered to the Front Range through the Windy Gap project and <br />the CBT system. Water is pumped from Windy Gap reservoir Gust west of Granby) to Lake <br />Granby where it is conveyed through the CBT system to Front Range water providers. <br /> <br />2-4 <br /> <br />\\DENSVR1\PROJECTS\9228 - ERIE\59443 - CONSERVATION PLAN\REPORT\FINAL DRAFT\SECTION 2.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.