My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erie_WCPlan_95%PR
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Erie_WCPlan_95%PR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:34:04 AM
Creation date
4/9/2008 2:24:34 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Applicant
Town of Erie
Project Name
Town of Erie Water Conservation Plan
Title
95% Progress Report
Date
5/16/2007
County
Weld
Water Efficiency - Doc Type
Interim Reports
Document Relationships
Erie WC Plan2008
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Town of Erie <br />Water Conservation Plan <br />950/0 Completion Report <br />May 16,2007 <br /> <br />Grant Recipient: <br /> <br />T own of Erie <br />645 Holbrook Street <br />Erie, Colorado 80516 <br /> <br />Contact: <br /> <br />Gary Behlen, Public Works Director <br />303-926-2871 <br />gbehlen@ci.erie.co.us <br /> <br />The Town of Erie (Erie) is developing a Water Conservation Plan (Plan). The Plan <br />will meet the requirements for Colorado Water Conservation Board (CWCB) Water <br />Conservation Grants, and will reference the recommendations outlined in the CWCB's <br />Water Conservation Plan Development Guidance Document. <br /> <br />This 95% Completion Report fulfills a CWCB Conservation Plan grant requirement. <br />A summary of the status for each of the sections of the report outlined in CWCB's <br />Water Conservation Plan Development Guidance Document, as well as the Public <br />Outreach effort, is provided below. This draft Plan is currently undergoing the 30- <br />day public review process. Once public comments are received, considered, and <br />incorporated into the Plan as appropriate, the Plan will be submitted to CWCB. <br /> <br />This report describes the main activities associated with the development of the Plan <br />as well as the public outreach effort. A copy of the 95% completed Conservation Plan <br />draft is attached as Attachment A. <br /> <br />Develop Water Conservation Plan <br /> <br />Data and information on Erie relevant to the Plan were provided to Erie's consultant, <br />CDM, through a meeting held in Erie and frequent correspondence by telephone and <br />email. As previously mentioned, a copy of the 95% completed Conservation Plan <br />draft is attached as Attachment A. It is important to note that this is a working draft <br />of the Conservation Plan. Modifications are anticipated prior to submission of the <br />final document. <br /> <br />Profile the Existing System <br />A draft description of the physical characteristics of the existing water supply system <br />was developed. Information specific to this subtasl( includes land use, population, <br />historical water demands, water supplies, and other general characteristics of Erie's <br />service area. Information specific to system limitations, the billing system, as well as <br />water restrictions, planning initiatives, and existing water conservation activities are <br />also provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.