Laserfiche WebLink
<br />CDNI <br /> <br />Section 2 <br />Profile of Existing Water System <br /> <br />Table 2-2 2007 Water System Profile <br /> <br />Service Characteristics I Value <br /> Prepared a <br />Planning Plan Completion Date Filed with State <br />Northern Integrated Supply Plan Participant in regional I n process of EIS document <br /> plan completing final phase <br />Windy Gap Firming Project Participant in regional I n process of EIS document <br /> plan completing final phase <br />Potable Water Master Plan Yes March 2007 No <br />Non-potable Water Master Plan I n process Spring 2007 No <br />Drought or emergency plan No No No <br />Water Conservation Plan This Document June 2007 Will be filed <br /> <br />* This does not include use of reclaimed water. Section 2.6 provides more information. <br />** Average-year water right yields. See Table 2-3. <br /> <br />2.2 Sources of Water <br /> <br />Erie's water supply portfolio consists of a variety of surface water supplies. This <br />includes reservoir, ditch, CBT, and Windy Gap water rights with a total average year <br />yield of 7,022 acre-feet per year (AFY). Table 2-3 shows Erie's current water supply <br />portfolio. These supplies provide an adequate amount of water to meet current needs. <br />However, additional water rights will be needed to meet future demands. <br /> <br />Table 2-3 Erie's Existing Water Rights, November 2006 <br /> <br /> Average I Average I Dry Year I Dry Year <br /> I No. of Shares I Annual Yield Annual Yield Annual Yield Annual Yield <br />Water Right Name or Units Owned (AF/share) (AF) (AF/share) (AF) <br />Transbasin Sources <br />CBT - Variable Quota 6,503 0.7 4,552 1 6,503 <br />CBT - Fixed Quota 190 0.7 133 0.6 114 <br />Subtotal CBT 6,693 n/a 4,685 n/a 6,617 <br />Windy Gap Project 14 50 700 0 0 <br />Subtotal 6,707 n/a 6,085 n/a 6,617 <br />Reservoir Storage <br />Erie Reservoir 239 1.0 239 0.3 72 <br />Prince Reservoir 80 1.0 80 0.3 24 <br />Thomas Reservoir 148 1.0 148 0 0 <br />Subtotal 467 n/a 467 n/a 96 <br />Mutual Irrigation Company Ownership <br />Leyner Cottonwood Ditch 294 0.54 158 0.21 62 <br />South Boulder Canyon Ditch 203 2.9 589 0 0 <br />Erie Coal Creek Ditch and 83 4.9 407 0.56 46 <br />Reservoir Co. <br />FRICO - Marshall Lake Div. 4 4 16 0.5 2 <br />Subtotal 584 n/a 1,170 n/a 110 <br />Total 7,758 n/a 7,022 n/a 6,823 <br /> <br />As shown in Table 2-3, Erie's existing ditch water rights yield approximately <br />1,170 AFY in an average year and 110 AFY in a dry year. The use of raw ditch water is <br />advantageous over using treated potable water for irrigation in that ditch water rights <br />used for irrigation may not need to be converted to municipal use, ditch water <br />requires no treatment (providing economic savings), and unlike direct use of <br />reclaimed wastewater, ditch water is not subject to the provisions of Colorado's reuse <br /> <br />2-5 <br /> <br />\\DENSVR1\PROJECTS\9228 - ERIE\59443 - CONSERVATION PLAN\REPORT\FINAL DRAFT\SECTION 2.DOC <br />