My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO 2010 Drought Mitigation & Response Plan SOW
CWCB
>
Grants
>
DayForward
>
CO 2010 Drought Mitigation & Response Plan SOW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2011 3:51:36 PM
Creation date
3/31/2011 4:16:01 PM
Metadata
Fields
Template:
Grants
Applicant
AMEC Earth & Environmental Inc.
Grant Type
Non-Reimbursable
Severance Tax
Fiscal Year (i.e. 2008)
2009
Project Name
Update to Colorado Mitigation & Response Plan
CWCB Section
Water Conservation & Drought Planning
Contract/PO #
C154152
Grants - Doc Type
Scope of Work
Document Relationships
CO 2010 Drought Mitigation & Response Plan Contract
(Message)
Path:
\Grants\DayForward
CO 2010 Drought Mitigation & Response Plan Invoices
(Message)
Path:
\Grants\DayForward
CO 2010 Drought Mitigation & Response Plan March 2010 Prog Reports
(Message)
Path:
\Grants\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Deliverables as Noted in the RFP <br />Related AMEC Proposed Task <br />4.1 Updated Plan <br />Tasks 1 - 5 <br />4.2 Communications Strategy <br />Task 2 <br />4.3 Recommendations for Impact Task Forces <br />Task 4 <br />4.4 Data Collection Platform <br />Task 2 <br />4.5 Drought Planning Toolbox <br />Task 6 <br />4.6 Materials for web page <br />Task 6 <br />4.7 Hard Copies of completed Plan <br />Task 5 <br />4.8 CD /DVD of completed Plan <br />Task 5 <br />4.9 Project Administration <br />All Tasks <br />b. Provide an overview schedule that includes interim benchmarks which will achieve the <br />schedule required in section 3.0. <br />AMEC is ready to begin work on this project upon receiving a written notice to proceed <br />from the CWCB or upon completion of a mutually acceptable signed contract. The <br />adjustable schedule shown below assumes a start date of September 15, 2009, though <br />we are prepared to start earlier or later, as needed. All project tasks will be completed <br />by September 30 of 2010. <br />Schedule <br />See next page. <br />ameO 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.