My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brighton_WaterAudit_ApprvlLtr
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Brighton_WaterAudit_ApprvlLtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 1:27:30 PM
Creation date
12/23/2009 11:10:40 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
OE PDA 10-77
Applicant
City of Brighton
Project Name
Commercial Water Audit & Fixture Replacement Program
Title
Approval Letter
Date
12/23/2009
County
Weld
Water Efficiency - Doc Type
Approval Letter
Document Relationships
Brighton 2008 WCPlan
(Attachment)
Path:
\Water Conservation\DayForward
Brighton_WaterAudit_50%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_75%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_Applic
(Message)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_FinalReport
(Message)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_Invoice
(Message)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WaterAudit_PO
(Message)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Name of Applicant: _City of Brighton <br />Date Received: 8 -3 -09 <br />HB 05 -1254: Evaluation checklist for Entities <br />For Covered Entity Applicant: <br />Yes <br />No <br />Comments: <br />s the applicant a covered entity? <br />x <br />Does the covered entity have a state approved water conservation plan in <br />x <br />iccordance with statutory revision 37 -60 -126? (HB 04- 1365)? <br />If answered no to the above question) then, Does the covered entity have <br />t locally adopted water conservation plan with defined water saving <br />;oals? <br />Did the applicant provide disclosure of its organizational structure /chart? <br />x <br />Did the applicant provide its charter? <br />x <br />Did the applicant provide a written statement from the entity's governing <br />x <br />Statement in <br />)oard, stating the entity's commitment to the project and the entity's <br />cover letter <br />;ommitment to implementing long -term water saving measures and <br />)ro rams (w /authorized signature)? <br />Did the applicant provide a cover letter with the entity name, contact <br />x <br />nformation, and a signature of an individual with the authority to commit <br />he resources of the entity? <br />Did the applicant provide a list of people and/or organizations that will be <br />x <br />nvolved in assisting with the grant project (list of who will be utilizing <br />he grant money)? <br />characterizing Water System: <br />- - - -- <br />- - - -- <br />------ - - - - -- <br />Did the entity provide their annual retail water demand for the past five <br />x <br />rears (in acre ft. or million gallons)? <br />Did the entity identify their retail water delivery for each of the past five <br />x <br />rears (in acre feet or million gallons)? <br />Not required, but preferred), Did the applicant provide information <br />x <br />;haracterizing past water use by sector, (e.g. residential, commercial, and <br />ndustrial) and the source (e.g. surface water, groundwater, etc). <br />Did the entity provide current (and if available past) per capita water use <br />x <br />'or the last five years and the basis for this calculation? <br />Did the entity provide their past, current, and predicted future population <br />x <br />;erved by the entity, (and the source of this information)? <br />Did the entity state the water savings that was accomplished in the asst <br />x <br />We years through water conservation efforts? <br />Did the entity state water savings goals to be achieved through the <br />x <br />m lementation of the "project "? <br />kdequacy, Stability, and reliability of the entity's water system <br />x <br />'to be measured and examined by staff through analysis <br />Description of Project: <br />- - - - -- <br />- - - -- <br />------- - - - - -- <br />Did the applicant write a paragraph stating the purpose and the primary <br />x <br />'eatures of the project? <br />Did the applicant provide a detailed narrative (description) of tasks to be <br />x <br />)erformed with grant monies (stating how grant money will be used to <br />tchieve project goals)? *(a "scope of work" can combine this item with <br />he timeline described below) <br />
The URL can be used to link to this page
Your browser does not support the video tag.