My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Longmont WC Plan 2008
CWCB
>
Water Conservation
>
DayForward
>
Longmont WC Plan 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2015 11:23:29 AM
Creation date
11/24/2008 3:08:30 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Contract/PO #
OE PDA 08-15
Applicant
City of Longmont
Project Name
City of Longmont Water Conservation Plan
Title
City of Longmont Water Conservation Master Plan
Date
11/24/2008
County
Boulder
Water Conservation - Doc Type
Complete Plan
Document Relationships
Longmont_WCPlan_50%ProgReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WCPlan_95%ProgReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WCPlan_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WCPlan_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WEPlanUpdate_2018
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WATER CONSERVATION PLAN 2008 <br />The total forecasted monthly treated water production (in acre -feet) was also estimated <br />based on a similar procedure to calculate average month production. The following is a <br />brief summary of the methodology used to predict average month water demands: <br />• Annual total treated water demand forecasts (in million gallons) from the previous <br />section were converted to annual average production rates in million gallons per day <br />(mgd), <br />• Daily plant production data was evaluated from 2002 to 2006 to determine the average <br />values for each month, and the annual average in mgd, <br />• The average month to annual average was calculated for each month, the average of <br />this value from 2002 to 2006 was the average month to annual average factor, <br />• The average month was forecasted for each month by applying the average month to <br />annual average factor to the forecasted annual average through 2017. <br />Appendix B provides additional detail regarding how the forecasting of monthly water <br />demands was performed. <br />Based on the methodology described above the total annual treated water demand in 2017 <br />including 8.1 % unaccounted for water and treatment plant efficiency of 94.7% was <br />estimated as 21,080 acre -feet, with a monthly peak of slightly under 3,200 acre -feet. <br />Current water treatment capacity for the City is about 56,000 acre -feet annually. Monthly <br />production forecasting results are presented in the Figure 6. <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.