Laserfiche WebLink
<br />CDM <br /> <br />Section 4 <br />Proposed Facilities <br /> <br />Table 4-3 Present Value Costs <br /> <br />Year Annual Water <br /> Production <br /> (Assuming Projected Present value of supply <br /> Demands) Present value of supply cost cost per gallon <br /> 1000 gal $ $/1000 gal <br />2006 613,002 $1,575,940 $2.57 <br />2007 618,166 $1,606,997 $2.60 <br />2008 633,934 $1 ,653,833 $2.61 <br />2009 639,750 $1,689,770 $2.64 <br />2010 645,560 $1,390,766 $2.15 <br />2011 652,671 $1,434,319 $2.20 <br />2012 652,671 $1,470,542 $2.25 <br />2013 652,671 $1,508,248 $2.31 <br />2014 652,671 $1,547,493 $2.37 <br />2015 652,671 $1,588,329 $2.43 <br /> Average $1,546,624 $2.41 <br /> <br />4.3 Preliminary Capacity and Cost Forecasts Supply <br /> <br />Capacity <br /> <br />The District's water supply corresponds to its demand. This is because the District <br />relies on a groundwater which is a direct function of its demands. When demands <br />increase, well production increases and vice versa when demands are not as high, the <br />well production decreases. <br /> <br />Assuming the District continues to use its groundwater system on an as needed basis, <br />the addition of surface water supplies will increase the overall supply capacity. <br />Acquired water rights may provide a suitable surface supply in average years and a <br />surplus in wet years. Surplus water may be used to recharge the groundwater basin. <br />Figure 4-3 illustrates this situation. Conversely, in dry years surface water may be able <br />to meet half of the District's needs. Under this case, the District would use its <br />groundwater wells to meet its remaining wells. This is concept is called conjunctive <br />use, where groundwater and surface water supplies are used conjunctively to help <br />sustain groundwater levels. <br /> <br />4-7 <br /> <br />O:\Castle_Pines_North\Conservation Plan\Drafts Submitted For Review\Final Conservation Plan.doc <br />