Laserfiche WebLink
<br />CDM <br /> <br />Section 4 <br />Proposed Facilities <br /> <br />Wastewater <br /> <br />The Plum Creek Wastewater Authority (PCW A) wastewater treatment facility was <br />recently expanded from 3.55 mgd to approximately 6.0 mgd. The plant is currently <br />permitted for 4.87 mgd, yet has the capacity to further expand. Construction of the <br />expansion began in October 2002 and was completed in July 2005. The facility serves <br />CPN, Castle Rock, Castle Pines Metro, Castleton Center, and Silver Heights. As <br />discussed in Section 3.3, potable demands within the District's service area are <br />estimated to be 2,000 AFY (does not include 240 AF of reuse for the Ridge Golf <br />Course) at buildout around 2011. Figure 4-2 shows effluent production vs well <br />production (not including the Ridge Golf Course) for 2004 and 2005. (Wastewater data <br />was not available prior to 2004). This trend shows the annual wastewater production <br />is approximately 40 percent of well production, resulting in an estimated 800 AFY of <br />wastewater at buildout. Given that the addition of surface water supplies is not going <br />to increase water supply, but rather replace non-renewable supplies, surface water <br />supplies will not significantly change water consumption or wastewater production <br />levels. <br /> <br /> 100 <br /> 90 <br /> 80 <br /> 70 <br /><.9 <br />~ 60 <br />c <br />0 50 <br />~ <br />::J 40 <br />"'C <br />0 <br />0: 30 <br /> 20 <br /> 10 <br /> 0 <br /> -=::t -=::t -=::t -=::t -=::t -=::t L[) L[) L[) L[) L[) L[) <br /> 9 9 0 9 9 0 9 9 0 9 9 0 <br /> c Co ~ "S a. > c Co ~ "S a. > <br /> co co """") Q.) 0 co co """") Q.) 0 <br /> """") ~ ~ if) z """") ~ ~ if) z <br /> <br /> <br />~ Well Production (Potable) - Wastewater Production <br /> <br />Figure 4-2 <br />Well and Wastewater Productions <br /> <br />4.2 Incremental Cost Analysis <br /> <br />Table 4-3 shows the annual well production, the present value of supply costs in <br />nominal dollars, and the present value of supply costs per gallon. The average cost <br />per gallon for the 10-year planning period is $2.41/ gallon. <br /> <br />4-6 <br /> <br />O:\Castle_Pines_North\Conservation Plan\Drafts Submitted For Review\Final Conservation Plan.doc <br />