Laserfiche WebLink
<br />CDM <br /> <br />Section 3 <br />Water Use and Forecasted Demands <br /> <br />Daily Water Demands <br />Table 3-4 shows average and peak day water demands for 2004, 2005, and projected <br />peak daily demands. Projected peak demand at buildout is estimated to be 5.4 mgd. <br />This was determined by multiplying the 2005 peak day ratio by the projected daily <br />average at build out. <br /> <br />Table 3-4 2004 and 2005 Daily Demands <br /> <br /> Daily Average Daily <br /> Demand Peak Day Demand Time of Peak Average/Peak <br />Year (mgd) (mgd) Day Day <br />2004 1.3 3.1 June* 2.5 <br />2005 1.4 4.3 July 3.0 <br />Buildout 1.8 5.4 summer 3.0 <br /> <br />* A complete set of July 2004 data was not available. The highest peak day occurred in June based on <br />the data available. <br /> <br />3-12 <br /> <br />O:\Castle_Pines_North\Conservation Plan\Drafts Submitted For Review\Final Conservation Plan.doc <br />