My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brighton_WCPlan_50%PR
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Brighton_WCPlan_50%PR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 1:05:58 PM
Creation date
11/1/2007 9:46:21 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 07-72
Applicant
City of Brighton
Project Name
City of Brighton Water Conservation Plan
Title
50% Complete Progress Report
Date
10/26/2007
County
Adams
Water Efficiency - Doc Type
Interim Reports
Document Relationships
Brighton 2008 WCPlan
(Message)
Path:
\Water Conservation\DayForward
Brighton_WCPlan_95%PR
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WCPlan_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WCPlan_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WCPlan_Invoice
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Brighton_WCPlan_PO
(Message)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />22South 4th Avenue · Brighton, Colorado 80601 · (303] 655-2000 <br /> <br />October 26, 2007 <br /> <br />~v1s. Tammie Petrone <br /> <br />CWCB, Office of Water Conservation and Drought Planning <br />Grants Coordinator <br />13 13 Sherman, Room 721 <br />Denver, CO 80203 <br /> <br />RE: Transmittal of 50% Complete Progress Report - Water Conservation Planning <br />Grant <br /> <br />Dear Tammie: <br /> <br />Please find herein, the City of Brighton's 50% project report prepared in accordance with <br />the Water Conservation Planning Grant requirements. The report provides information <br />on the steps completed thus far, those issues encountered and discussion on moving <br />forward with completion of the plan. <br /> <br />Project Steps Completed <br /> <br />Since April of this year, Brighton has been able to substantially complete Steps 1 through <br />4 and we are currently working on Steps 5 through 9. The draft Water Conservation Plan <br />(Step 9) is currently about 50% complete Working with our consultant Great Western <br />Institute, along with various department staff members, we have been able to compile the <br />necessary data on Brighton's existing water systems, the characteristics of our customers <br />and the success of existing conservation measures. This information established the <br />groundwork to forecast demands,.review future capital water facilities needs, and <br />identifying savings potential with implementation of additional conservation methods. <br /> <br />Weare currently refining the water demand forecasts based on information received from <br />staff (see project obstacles) and will move forward with the revised forecasts to refine the <br />water conservation goals (Step 4), identify water conservation measures and programs <br />(Step 5), evaluate and select water conservation measures and programs (Step 6), <br />integrate the measures and programs with the forecast (Step 7) and develop the <br />implementation plan (Step 8). These steps will be substantially completed in November <br />such that the Draft Water Conservation Plan can be prepared for City Council and public <br />review by the end of December. <br />
The URL can be used to link to this page
Your browser does not support the video tag.