Laserfiche WebLink
<br />" . ... <br /> <br />10 <br /> <br />- <br /> <br />GRANT APPLICATION. PART 3 <br />ESTIMATED PROJECT COSTS <br /> <br />Please provide Information on how you propose to spend grant funds. Be sure to <br />Include estimated costs for the following: <br /> <br />+ Professional services <br />+ Construction <br />+ Equipment or devices <br />+ Installation <br />+ Planning and design <br />+ Miscellaneous <br /> <br />TOTAL PROGRAM COSTS* <br /> <br />Project 1: Water Meter Upgrades <br />(materials & labor) <br /> <br />$20,310 <br /> <br />( pr..Oject2: <br />\'-" <br /> <br />Public Open Space Irrigation <br />(materials.& labor) <br /> <br />4,250 . <br /> <br />Project 3: Water Conserving Plumbing <br />(materials only) <br /> <br />8, 750'~ <br /> <br />r Project 4: <br /> <br />Public Education <br />(typesetting, printing, & postage) <br /> <br />3,600 '. <br /> <br />TOTAL COSTS <br /> <br />$35,910 <br /> <br />*Note: The costs of all administration and engineering services will be paid by <br />the Town. <br /> <br />-4- <br />