My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gilcrest WC Project Contract
CWCB
>
Water Conservation
>
Backfile
>
Gilcrest WC Project Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2011 11:09:49 AM
Creation date
9/30/2006 9:01:29 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153613
Applicant
Town of Gilcrest
Project Name
Water Conservation Project
Title
Contract
Date
6/16/1992
County
Weld
Water Conservation - Doc Type
Contract
Document Relationships
Gilcrest WC Project Applic
(Message)
Path:
\Water Conservation\Backfile
Gilcrest WC Project Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
Gilcrest WC Project Final Report
(Message)
Path:
\Water Conservation\Backfile
Gilcrest WC Project Progress Report
(Message)
Path:
\Water Conservation\Backfile
Gilcrest WC Project WorkPlan
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DEPAR1MENT OR AGENCY NUM <br /> <br /> <br />CONTRACf ROlITING NUMBER <br />3 <br /> <br />j~ <br /> <br />CONI'RACf <br /> <br />TIllS CONTRACf, made this 12!h day of June 1992, by and between the State of Colorado for the use and benefit of the Department <br />of Natural Resources. Colorado Water Consctvation Board. 1313 Sherman St. Room nl. Denver. Colorado 80203 hereinafter referred to as the State, <br />and Town of Gilcrest. P.O. Box 128. Gilcrest. Colorado. 80623, hereinafter referred to as the Contractor, <br /> <br />WHE~' authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a sufficient <br />unencumbered balance there of remains available for payment in Agency PDA. Fund Number ~ Organization 92YY. Appropriation Code 1QQ, Program <br />WI'RC. Object Code 5110. Sub Object Code 06 Contract Encumbrance Number ~ , '\:, (p ) 'I ; and <br /> <br />WHEREAS, required approval, clearance and coordination has been accomplished from and with appropriate agencies; and <br /> <br />WHERFAS. the State desires to assist public agencies, established under Colorado law, for the purpose of a pilot program demonstrating <br />the benefits of water efficiency measures by providing incentive grants pursuant to the authority granted in Section 37-60-125, CRS; and <br /> <br />WHEREAS, the Contractor's application fora grant from the Water Conservation Board Construction Fund has been received and approved <br />by the Colorado Water Conservation Board; and <br /> <br />Wl-IEREAS, the Colorado Water Conservation qoard desires to distribute said funds pursuant to law; and <br /> <br />WIIERFAS, the Contractor is an eligible public agency to receive grant assistance from the Pilot Program for demonstrating the benefits <br />of water efficiency measures. <br /> <br />NOW TIIEREFORE it is hereby agreed that: <br /> <br />1. Area Covered. The Contractor shall perform and accomplish all the necessary work and services provided under this Contract, as <br />described in the attached Exhibit A, which is incorporated herein and made part of this Contract by reference. <br /> <br />2. Scooe of Services. In consideration for the monies to be received from the State, the Contractor shall do, perform, and carry out, in <br />;J satisfactory and proper manner, as detennined by the State, all work elements as indicated in the .Scope of Services", set forth in the attached Exhibit <br />A, hereinafter referred to as the .Project" and incorporated herein. Work performed prior to the execution of this Contract shall not be considered part <br />of this Project. <br /> <br />3. Resoonsible Administrator. The performance of the seIVices required hereunder shall be under the direct supervision of Gina Janen, <br />an employee or agent of Contractor, who is hereby designated as the administrator-in--charge of this Project. If At any time the administrator-in-<harge <br />changes the Board must be given written nOlice of the change and must approve the replacement before any further monies are distributed. <br /> <br />4. Time of Perfonnance. This Contract shall become effective upon proper execution of this Contract by the State Controller or his <br />designee. The Project contemplated herein shall commence as soon as practicable after the execution of this Contract and shall be undertaken and <br />performed in the sequence set forth in the "lime of Performance" in the attached Exhibit A Expenses incurred by the Contractor in association with said <br />Project prior to execution of this Contract shall not be eligible expenditures. The Contractor agrees that time is of the essence in the perfomlance of its <br />obligations under this Contract, and that completion of the Project shall occur no later than the termination date set forth in the Time of Performance <br />in Exhibit A <br /> <br />5. Comoensation and Method of PaYment. The State agrees to pay to the Contractor, in consideration for the work and services to be <br />performed, a total amount not to exceed SIXTEEN TIIOUSAND SIX HUNDRED DOLLARS AND N0/100 ( $16.600). The method and time of <br />payment shall be made in accordance with the "Payment Schedule" set forth in Exhibit A <br /> <br />Page 1 of 6 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.