My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wiggins Metering Contract
CWCB
>
Water Conservation
>
Backfile
>
Wiggins Metering Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:39:59 AM
Creation date
9/30/2006 9:02:06 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153646
Applicant
Town of Wiggins
Project Name
Metering Project
Title
Contract
Date
7/15/1993
County
Morgan
Water Conservation - Doc Type
Contract
Document Relationships
Wiggins Metering Application
(Message)
Path:
\Water Conservation\Backfile
Wiggins Metering Final Report
(Message)
Path:
\Water Conservation\Backfile
Wiggins Metering Prog Report
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />f <br /> <br /> <br />I <br /> <br /> <br />CONTRACT <br /> <br />THIS CONTRACf. made lhis 15th day of .!!!!r.1993. by aDd between the State of Colorado for the use and benefit of the Depanment of Natural <br />Resources. Colorado Water Conservation Board. 1313 Shennan St. Room 721. Denver. Colorado 80203 hereinafter referred to as the State, and the Town of <br />Wigp:ins, P.O. Box 287, WiP:Rins, Colorado, 80654, hereinafter referred to as the Contractor. <br /> <br />WHEREAS. authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a sufficient unencumbered <br />balance there of remains available for payment in Agency PDA. Fund Nif1ber~. Orga~tion 92vY, Appropriation Code 100. Program WTRC, Object Code <br />5110. Sub Object Code 11. Contract Encumbrance Number rl-5_~" b ; and . <br /> <br />WHEREAS. required approval. clearance and coordination has been accomplished from and with appropriate agencies; and <br /> <br />WHEREAS, the Stale desires to assist public agencies, established under Colorado law, for the purpose of a pilot program demonstrating the <br />benefits of water efficiency measures by providing incentive grants pursuant to the authority granted in Section 37-60-125, CRS; and <br /> <br />WHEREAS, the Contractor's application for a grant from the Water Conservation Board Construction Fund has been received and approved by <br />the Colorado Water Conservation Board; and <br /> <br />WHEREAS, the Colorado Water Conservation Board desires to distribute said funds pursuant to law; and <br /> <br />WHEREAS, the Contractor i.s an eligible public agency to receive grant assistance from the Pilot Program for demonstrating the benefits of water <br />efficiency measures, <br /> <br />NOW THEREFORE it is hereby agreed that: <br /> <br />1. Area Covered. The Contractor shall perform and accomplish all the necessary work and services puvided under this Contract, as described <br />in the attached Exhibit A. which is incorporated herein and made part of this Contract by reference. <br /> <br />2. Scope of Services. In consideration for the monies to be received from the State, the Contractor shall do, perform, and carry out, in a <br />satisfactory and proper manner, as determined by the State, a\1 work elements as indicated in the "Scope of Services", set forth in the attached Exhibit A, <br />hereinafter referred to as the "Project" and incorporated herein. Work performed prior to the exewtion of this Contract shaH not be considered pan of this Project. <br /> <br />3. Responsible Administrator. The performance of the services required hereunder shall be under the direct supervision of John C. Holdren, an <br />employee or agent of Contractor, who is hereby designated as the administrator.in-charge of this Project. If At any time the administrator-in-charge changes the <br />Board must be given written notice of the change and must approve the replacement before any further monies are distributed. <br /> <br />4. Time of Performance. 'This Contract shall become effective upon proper execution of this Contract by the Stale Controller or his designee. <br />The Project contemplaled herein shall conunence as soon as practicable after the execution of this Contract and shall be undenaken and performed in the sequence <br />set forth in the "Time of Perfonnance" in the attached Exhibit A. Expenses incurred by the Contractor in association with said Project prior to execution of this <br />Contract shall not be eligible expenditures. The Contractor agrees that time is of the essence in the perfonnance of its obligations under this Contract, and that <br />completion of the Project shall ocaJr no laler than the termination date set forth in the Time of Perfonnance in Exhibit A. <br /> <br />5. Compensation and Method of Payment. The Stale agrees to pay to the Contractor. in consideration for the work and services to be performed, <br />a total amount not to exceed FlFfEEN THOUSAND AND NO/loo Dollars ( $15,000). The method and time of payment shall be made in accordance with <br />the "Payment Schedule" set forth in Exhibit A. <br /> <br />Page I of 6 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.