My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELCO WCPlan2007
CWCB
>
Water Conservation
>
DayForward
>
ELCO WCPlan2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 4:06:14 PM
Creation date
1/17/2008 11:29:31 AM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Contract/PO #
OE PDA 07-60
Applicant
East Larimer County Water District
Project Name
East Larimer County Water District Water Conservation Plan
Title
East Larimer County Water District Water Conservation Plan
Date
6/1/2007
County
Larimer
Water Conservation - Doc Type
Complete Plan
Document Relationships
ELCO_DemoGarden_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
ELCO_DemoGarden_FinalReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
ELCO_LeakDetection_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
ELCO_WCPlan_50%ProgReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
ELCO_WCPlan_95%ProgReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
ELCO_WCPlan_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
ELCO_WCPlan_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
ELCO_WCPlan_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
ELCO_WEPlanUpdate2017
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />days to review the plan, which likely means approval in September 2007. It is only after <br />final CWCB approval that ELCO will be eligible for a water-efficiency grant through <br />CWCB for plan implementation. <br /> <br />Once grant monies are obtained, the Board will approve incremental parts of the plan <br />based on available resources. The proposed schedule for implementation is shown in <br />the following Table ES.3. <br /> <br />An effective monitoring and evaluation program will be necessary to determine the <br />success of this WCP. Each of these measures/programs will be evaluated annually to <br />monitor impacts related to projected revenue losses and water savings. CWCB <br />requires this WCP be updated at least once every seven years. ELCO will update this <br />plan prior to seven years if implementation and actual water savings deviate too much <br />from this WCP. <br /> <br />Table Es.3 - Water Conservation Plan Implementation Schedule <br /> <br />Conservation Measure or Program F actors that Anticipated <br />Action Required for Could Cause Implementation <br /> Implementation Delay Date <br />Existing <br /> Plan adoption following Plan not September <br />Leak Detection & Repair - 200/0 of system CWCB approval approved 2007 Board <br />per year, whole system every 5 years Meeting <br /> Plan adoption following Plan not September <br /> CWCB approval approved 2007 Board <br />Recycling filter backwash Meeting <br /> Plan adoption following Plan not September <br /> CWCB approval approved 2007 Board <br />Meter testing and replacement Meeting <br />Soil amendment and Landscape & Plan adoption following Plan not September <br />Sprinkler system review ordinances for CWCB approval approved 2007 Board <br />new residential in Ft. Collins GMA Meeting <br />Soil amendment and Landscape & Plan adoption following Plan not September <br />Sprinkler system review ordinances for CWCB approval approved 2007 Board <br />new commercial in Ft.Collins GMA Meeting <br /> Plan adoption following Plan not September <br />Temporary Irrigation taps for native CWCB approval approved 2007 Board <br />landscaping Meeting <br /> Plan adoption following Plan not September <br /> CWCB approval approved 2007 Board <br />Drought restrictions ordinance Meeting <br /> Plan adoption following Plan not September <br />Public Education - New customer CWCB approval approved 2007 Board <br />package, newsletter, bill stuffers Meeting <br /> Plan adoption following Plan not September <br />Designated water conservation officer CWCB approval approved 2007 Board <br />(through Fort Collins) Meeting <br />High Ranking <br /> Incremental acquisition Construction 6/1/2009 <br /> already approved delays and water <br />Water reuse system (Rigden storage) court decision <br /> <br />Clear Water Solutions, Inc. <br />East Larimer County Water District <br /> <br />2007 Water Conservation Plan <br /> <br />ES-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.