My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPN Calsense Application
CWCB
>
Water Efficiency Grants
>
Day Forward
>
CPN Calsense Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 3:57:03 PM
Creation date
11/6/2007 10:25:03 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
OE PDA 08-36
Applicant
Castle Pines North Metropolitan District
Project Name
CALSENSE - Irrigation Control System Demonstration
Title
Application for Water Efficiency Grant: Irrigation Control System Demonstration
Date
8/1/2007
County
Douglas
Water Efficiency - Doc Type
Application
Document Relationships
Castle Pines North WC Plan2007
(Message)
Path:
\Water Conservation\DayForward
CPN CalSense 50% ProgReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
CPN Calsense 95% ProgReport
(Message)
Path:
\Water Efficiency Grants\Day Forward
CPN Calsense Final Report
(Message)
Path:
\Water Efficiency Grants\Day Forward
CPN Calsense PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONI <br /> <br />Castle Pines Norlh Metropolitan District <br />AppJ;cation for Water Efficiency Grant <br /> <br />Task 4 - CWCB Grant Development and Status Reports <br /> <br />PtJ.rpose <br />This task involves the development of a 50 percent, 95 percent, and a final completion <br />status report to CWCB per the CWCBWater Efficiency Grant Requirement. Although <br />this task is a part of the overall project, its costs are not included in the project budget <br />submitted to CWCB for grant funding (Table 6). <br /> <br />Roles and Responsibilities <br />The District has engaged Camp Dresser & McKee Inc. (CDM) to develop this grant <br />application4 CDM would also prepare the status reports and the District would <br />review these reports prior to submittal to CWCB. <br /> <br />Deliverables <br />Status reports submitted to the CWCB at 50 percent, 95 percellt, and final project <br />completion. <br /> <br />14 <br /> <br />C:\DOCUMENTS AND SETTINGS\6I.ACKCA\OESKTOP\CPNGRANnWATER EFFICIENCY GRANT PROGRAM APPLICATION.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.