Laserfiche WebLink
<br />CDIVI <br /> <br />Castle Pines Norlh Metropolitan District <br />Application for Water Efficiency Grant <br /> <br />wire in from the irrigation controllers to the master valve and master meter at each <br />park site. . <br /> <br />Deliverables <br />The District plans to begin the installation of this equipment once the Phase I <br />equipment is installed and operational. Section 5.0 provides the preliminary schedule. <br /> <br />Task 3 - Operational Set Up and Initial Monitoring <br /> <br />Purpose <br />This task involves the operational set up of tile equipmellt following installation and <br />developing a protocol for recording monitoring data. <br /> <br />Roles and Responsibilities <br />CALSENSE and Ewing Irrigation staff would provide the District technical assistall.ce <br />and training in operating the equipment and educating District staff on the central <br />control station's software. It is anticipated that District staff would spend several <br />weeks installing and learning how to operate the system in addition to establishing a <br />monitoring protocol The District also plans to distribute information to their <br />customers and general public on the Irrigation Management System. Table 4 at the <br />end of this section outlines the specific responsibilities, labor rates, and anticipated <br />level of effort for District staff. <br /> <br />Deliverables <br />The Irrigation Management System would provide detailed metered data of irrigation <br />application rates. District staff would consolidate this data on a monthly basis, <br />recording the monthly amount of irrigated water used at each park~ ET and <br />precipitation data would also be collected for data comparison pur,poses. These data <br />would be used to estimate the amount of District irrigated water saved on an annual <br />basis. The estimated water savings will be presented in the Final Completion Report <br />submitted to the CWCB. The District also plans to develop a Fact Sheet that provides <br />general information on the installation, operation, and overall water saving benefits of <br />the Irrigation Management System. This Fact Sheet will be available to CALSENSE <br />distributors as well as to CWCB for public distribution. The District will also be <br />available for on-site demonstrations for water providers, Parks and Opens Space <br />Managers, and Irrigation Specialists that are interested in learning more about the <br />systems. <br /> <br />5 As indicated in Table 61' the development of the Fact Sheet and water savings estimates for <br />the first year of irrigation is included in the project budget However" the production of Fact <br />Sheets and on-site product demonstratiollS are not included. There is too muc.h uncertainty on <br />the number of Fact Sheets needed and tours given to provide a reasonable estimate. <br /> <br />13 <br /> <br />C~'\OOCUMENTS AN 0 SETTINGS\SLACKCA\O~SKTOP\CPNG RANTlWA TER EFFICIENCY GRANT PROGRA~ AP Pt..ICA TION-DOC <br />