Laserfiche WebLink
<br />ClIVI <br /> <br />Castle Pines North Metropolitan District <br />Application for Water Efficiency Grant <br /> <br />Table 4. Responsible Parties Rates and Roles <br />Party Staff Position Rate Role <br /> Member <br />Ewing Irrigation Unknown Unknown $100/hr . Provide approximately 36 <br /> hours in assisting District <br /> staff with the installation and <br /> operational set up of the <br /> system <br /> . Su pply District with the <br /> Irrigation Management <br /> System <br /> . Assist with establishing <br /> communications between <br /> controllers and Central <br /> Computer <br />Clear Water Unknown Unknown $60.00/hr . Install puU in wire for the <br />Landscaping Master valves and flow <br /> meters <br />Parker Electric Unknown Electrician $75.00/hr . Extend 110 volt electrical line <br />Company from, the community center to <br /> the weather station <br />District Jim McGrady Manager $48.22/hr . Coordinate with Ewing <br /> I rrig anon <br /> . Coordinate with installation <br /> and set up of equipment <br /> . Coordinate initial monitoring <br /> . Provide technical support <br /> . Interlace with Board of <br /> Directors <br /> Charlie Metro District Parks $38.14/hr . Work with Ewing on <br /> Fagan and Open Space in8tallation phases <br /> Manager . Conduct operational set up <br /> . Coordinate monitoring <br /> John Van Parks and Open $27.61/hr . Work with Ewing on <br /> Eps Space Maintenance installation phases <br /> Foreman . Conduct operational set up <br /> . Monitoring I <br /> . Install Weather station Base <br /> . Install Master Valves <br /> . Install Master Meters <br /> . Coordinate work perfonned <br /> by sub contractors <br /> Michael Parks/Utility $12.00Ihr . Provide assistance for <br /> McGrady Maintenance equipment installation and <br /> and Dan Worker operational set up <br /> Rabon <br /> Denise Consultant $50.00/hr . Write newsl.etter article to be <br /> Basset Communications distributed to customers <br /> . Develop Fact Sheet to be <br /> provided to CWCBt <br /> CAlSENSE distributors, and <br /> to the general public <br /> <br />5.0 Project Schedule <br /> <br />The preliminary project schedule identifying key activities and milestones is <br />presented in Table 5. These dates are contingent on receipt of the grant funds, <br />weather, and any technical installation factors that could occur. All billed materials <br /> <br />15 <br /> <br />C:\OOCUMENTS AN 0 SETflNGS\BLACKCAWI;SKTOP\CPNGRANTlWA TER E.FFICIENCY GRA.NT PR.OGAAM APF'llCA noN .DOC <br />