My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fort Lupton WCPlan 2007
CWCB
>
Water Conservation
>
DayForward
>
Fort Lupton WCPlan 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 3:49:40 PM
Creation date
8/9/2007 2:18:21 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Contract/PO #
OE PDA 07-17
Applicant
City of Fort Lupton
Project Name
City of Fort Lupton Water Conservation Plan
Title
City of Fort Lupton Water Conservation Plan
Date
8/1/2007
County
Weld
Water Conservation - Doc Type
Complete Plan
Document Relationships
FtLupton_WCPlan_50%ProgReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
FtLupton_WCPlan_95%ProReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
FtLupton_WCPlan_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
FtLupton_WCPlan_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
FtLupton_WCPlan_ApprvlLtr (2)
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
FtLupton_WCPlan_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 5.7 - Windy Gap Effluent Storage at WWTP, Opinion of Probable Construction Costs <br /> <br />Item Quantity Unit Unit Cost Item Cost <br />Mob/Demob and general contract requirements 1 LS $100,000 $100,000 <br />Earthwork, grading and misc. sitework 1 LS $50,000 $50,000 <br />Raw Water Storage 80 ac-ft $1 ,800 $144,000 <br /> Subtotal $294,000 <br />Design and Construction Contingencies (200/0) $58,800 <br />Contractors Overhead and Profit (150/0) $44,100 <br />Construction Cost Subtotal $396,900 <br />Engineering - Design Phase Services (80/0) $31,752 <br />Engineering - Construction Phase Services (40/0) $15,876 <br /> Total $444,528 <br /> <br />Clear Water Solutions, Inc. <br />City of Fort Lupton <br />2007 Water Conservation Plan <br /> <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.