Laserfiche WebLink
<br />Table 5.7 - Windy Gap Effluent Storage at WWTP, Opinion of Probable Construction Costs <br /> <br />Item Quantity Unit Unit Cost Item Cost <br />Mob/Demob and general contract requirements 1 LS $100,000 $100,000 <br />Earthwork, grading and misc. sitework 1 LS $50,000 $50,000 <br />Raw Water Storage 80 ac-ft $1 ,800 $144,000 <br /> Subtotal $294,000 <br />Design and Construction Contingencies (200/0) $58,800 <br />Contractors Overhead and Profit (150/0) $44,100 <br />Construction Cost Subtotal $396,900 <br />Engineering - Design Phase Services (80/0) $31,752 <br />Engineering - Construction Phase Services (40/0) $15,876 <br /> Total $444,528 <br /> <br />Clear Water Solutions, Inc. <br />City of Fort Lupton <br />2007 Water Conservation Plan <br /> <br />34 <br />