My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Castle Pines North WC Plan2007
CWCB
>
Water Conservation
>
DayForward
>
Castle Pines North WC Plan2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 1:44:44 PM
Creation date
5/1/2007 10:36:12 AM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Applicant
Castle Pines North Metropolitan District
Project Name
Water Conservation Plan
Title
Castle Pines North Metropolitan District Water Conservation Plan
Date
8/1/2006
County
Douglas
Water Conservation - Doc Type
Complete Plan
Document Relationships
CPN Audit/Rainwater Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
CPN Audit/Rainwater Final Report
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
CPN Calsense Application
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
CPN Calsense Final Report
(Message)
Path:
\Water Efficiency Grants\Day Forward
CPN WCPlan Application
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
CPN WCPlan Approval Ltr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CDM <br /> <br />Section 4 <br />Proposed Facilities <br /> <br />A conventional or advanced water treatment plant (depending upon water quality) <br />would treat water stored in Rueter Hess, prior to conveyance to the District service <br />area. Another option would be to capture treated wastewater return flow credits <br />downstream of the wastewater discharge and convey the water to Rueter Hess for <br />storage. A pipeline would be constructed from downstream of the wastewater outlet <br />to Rueter Hess. Surface water could also be used to recharge the groundwater under <br />an aquifer storage and recovery (ASR) concept. This is described in more detail in <br />Section 4.3. The IWRP will provide a detailed evaluation of all these alternatives. <br /> <br />Approach <br /> <br />Given the number of water supply alternatives and the lack of knowledge on what <br />actions will be taken to acquire surface water supplies, specific information regarding <br />future costs and timing of when renewable surface water may come online is <br />unknown. The costs of a future surface water supply will be further influenced by the <br />District's investment decisions as well as the phasing of when and how the surface <br />supplies are brought online. Consequently, for the purposes of this Plan, the cost <br />analyses assume that the District will continue to rely on groundwater and the effects <br />of a renewable surface water supply is addressed qualitatively. <br /> <br />This Plan incorporates a planning period of 10 years from 2006-2015. A 10-year <br />planning period was chosen for the following reasons: <br /> <br />. Buildout is projected to occur in 2011. This planning period provides an adequate <br />period of time to capture demands at build out. <br /> <br />. Ten years provides a suitable time period to assess the effects of conservation <br />measures for Castle Pines North. <br /> <br />. It is not necessary to go beyond 10 years. The Colorado Water Conservation Board <br />requires that covered Conservation Plan be updated at a minimum of 7 years. The <br />update of this Plan will be able to capture much more information on the costs of <br />surface water supplies and conservation savings, given that there will be much <br />more data available. <br /> <br />Water Supply Improvements <br />Several improvements to the existing well system are planned for 2006 and 2007. In <br />2006 wells A-I and A-3 are to be rehabilitated. In 2007, well, A-5 is to be put online. <br />This well was originally drilled as a directional well. The well did not perform as <br />anticipated and experienced a number of construction related delays and issues; <br />however, data have shown that yields may be attained from the vertical portion of the <br />shaft. The horizontal portion is to be sealed off, enabling water to be withdrawn from <br />the vertical portion. <br /> <br />Costs for the use of groundwater during the planning period are shown in Table 4-1. <br />The capital and O&M costs are summed for each year and adjusted for escalation and <br />discount rates to obtain present value costs. Operation costs were adjusted for the <br />increase in water demand (See Section 3.3) and electricity costs. <br /> <br />4-3 <br /> <br />O:\Castle_Pines_North\Conservation Plan\Drafts Submitted For Review\Final Conservation Plan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.