My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_3364072
DWR
>
Board and Commission Meetings
>
2018
>
12
>
DWR_3364072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2022 4:19:28 PM
Creation date
12/27/2018 12:06:42 PM
Metadata
Fields
Template:
Board and Commission Meetings
Board or Commission
Colorado Ground Water Commission
Document Type - Board and Commission Meetings
Meeting Document
Document Date
8/21/2009
Subject
MEETING MATERIALS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />August 21, 2009 Meeting <br /> <br />MEMORANDUM <br /> <br />TO: Dick Wolfe, Executive Director – Ground Water Commission <br /> <br />FROM: Keith Vander Horst, Designated Basins Team <br /> <br />SUBJECT: Staff Activity Report for May 1, 2009 through July 31, 2009 <br /> <br />Various activities performed during the last quarter are briefly described below. <br /> <br />New and Replacement Applications <br /> <br />Table 1 provides a breakdown, by basin, of permitting activity for the last quarter. Permit activities are summarized as follows: <br /> <br />Small capacity: <br />71 small-capacity new and replacement well permit applications were received <br />107 small-capacity new and replacement well permits were issued <br /> <br />Large Capacity: <br />47 large-capacity new and replacement well permit applications, and Determination of Water Right applications, were received <br />110 large-capacity new and replacement well permits and Determinations of Water Rights were issued <br /> <br />Table 2 provides details on the pending individual large-capacity new and replacement permit applications and Determination of Water Right applications. <br /> <br />Change Applications <br /> <br />Table 1 also gives a breakdown, by basin, of change application activities for the last quarter: <br />37 new applications were received <br />18 change applications were approved <br /> <br />Table 3 provides details on the individual pending change applications. <br /> <br /> <br /> <br /> <br />Final Permit Activities <br /> <br />Below is a summary of the Final Permit Activity for the last quarter and a summary of the status of the Final Permit Project as a whole. Final permitting activity is generally on hold <br /> due to reduced staffing levels. What activity is occurring is for the Southern High Plains, Kiowa-Bijou, and Upper Black Squirrel Creek Designated Basins. <br /> <br /> <br />Final Permit Activity This Quarter <br />Basin Requests for SBUs* Permits Clarified Permits Published Final <br />Permits Issued <br />Misc. Contacts** Southern High Plains 0 0 3 0 0 Upper Big Sandy 0 0 0 0 0 Kiowa-Bijou 0 0 0 0 0 Northern High Plains 0 0 0 0 0 Lost Creek 0 0 0 0 0 Camp Creek 0 0 0 0 0 Upper <br /> Black Squirrel Creek 0 0 0 0 0 <br />* This field tracks only the first request for a Statement of Beneficial Use (SBUs). <br />** This field tracks meetings with the irrigators, telephone conversations, second and third requests for SBUs and other correspondence such as corrections to a previously submitted <br /> statement, reminders to return an amended statement or a request for a change in ownership form. <br /> <br />Final Permit Activity to Date Basin Total Number of Permits Total Final Permits Issued Percent Complete Upper Crow Creek <br />103 <br />102 <br />99% Northern High Plains 4221 <br />4219 <br /> 100% Lost Creek 414 292 71% Camp Creek 50 44 88% Upper Black Squirrel Creek 210 139 66% Southern High Plains 1244 404 33% Kiowa-Bijou 967 467 48% Upper Big Sandy 122 122 100% Total 7331 5789 <br />79% <br />Objections/Hearings <br /> <br />Below is a list of cases pending with the Commission. Details on these cases are contained in the Attorney General’s and Hearing Officer's reports. The Staff took part in pre-hearing <br /> conferences, preparation of pre-hearing statements, and otherwise worked on resolving these cases. The Booker applications were tried by the El Paso County District Court; the applicants <br /> have requested the Court to reconsider. The Upper Black Squirrel Creek GWMD Rules 17, 18 & 19 were approved by the El Paso County District Court; and have been appealed to the Colorado <br /> Court of Appeals. The Central & John Moser request to designate the Box Elder Creek basin has been appealed to the Weld County District Court. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.