Laserfiche WebLink
BOE Meeting Minutes <br /> August 13, 2024 <br /> Page 4 <br /> d) Todd Hunter asked if Greeley could use two of the 16 new wells to <br /> replace the two in question <br /> (1) Mr. Alstine stated that the 16 wells will be initially permitted as <br /> monitoring wells, so it would not be appropriate to use these <br /> wells to supply additional water. <br /> (2) Also stated there are other production wells in the area, but <br /> they are further and would be more difficult to use <br /> e) Discussion regarding current construction details, the conversion of the <br /> wells, the concern over this conversion, and possible action/variance <br /> language <br /> f) Mr. Hunter asked how long EB-1 and EB-2 would be used for water <br /> production. <br /> (1) Mr. Alstine estimated 2 to 4 months. <br /> g) Jen Mete asked for clarification regarding the rules that would require <br /> a provided variance <br /> (1) Mr. Jones clarified that a variance to Rules 14.1.1, 10.3.2, <br /> 10.5.3.4, 10.4.5.1c, and 10.4.5.1.d would be needed. <br /> h) Chris Sanchez moved to approve the variances to the rules described by <br /> Chris Jones with the conditions that the variance only applies through <br /> the end of 2025 and a condition that the wells are abandoned by the <br /> end of 2026. Also, water supply should be alerted to the fact that one <br /> of these wells is multiply completed, which should be taken into <br /> consideration during the permitting of the wells. <br /> (1) Motion amended to include a variance to Rule 10.1.D. <br /> (2) Motion amended to include a specification of a 4.5 acre-foot <br /> limitation for the annual withdrawal <br /> (3) Motion amended to include a variance to Rule 9.6 <br /> (4) Mr. Ullmann seconded <br /> (5) Motion carried <br /> 4. CDOT Well No. 1, Structure ID 807651, Abandonment Variance Request for No <br /> Perforation at Confining Layers <br /> a) Marshall Haworth provided an update on the situation. <br /> (1) Request is to place a tremmie pipe at the bottom and positively <br /> displace grout to abandon the well considering the <br /> deterioration of the well. <br /> b) Discussion regarding construction details and possible action <br /> c) Todd Hunter made a motion to tremmie grout from the bottom of the <br /> measured well to the surface with a single-pump operation as <br /> described in the variance request. Mr. Sanchez seconded. <br /> (1) Mr. Kunau stepped out for a meeting, so he did not participate <br /> in this vote. <br /> (2) Motion carried. <br /> *strikei:hrouh denotes Item was not.. discussed at this meeting <br />