My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_4386556
DWR
>
Board and Commission Meetings
>
2025
>
02
>
DWR_4386556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2025 9:26:46 AM
Creation date
2/6/2025 9:26:26 AM
Metadata
Fields
Template:
Board and Commission Meetings
Board or Commission
Board of Examiners
Document Type - Board and Commission Meetings
Meeting Document
Document Date
8/13/2024
Subject
BOE Meeting Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOE Meeting Minutes <br /> August 13, 2024 <br /> Page 3 <br /> D. Variances <br /> 1. 2024 Variances <br /> a) Nolan Tanguma provided the report. <br /> b) Todd Hunter asked for clarification regarding the difference between a <br /> casing and grout variance and an offset variance. <br /> (1) Kevin Donegan clarified that the offset variances typically <br /> involve deeper casing and grout for a nearby contaminant, <br /> while casing and grout variances typically involve a reduction in <br /> the requirements for Type II or Type III wells <br /> 2. Rangeview Horizontal Well Construction Request <br /> a) Brent Brouillard and Geoff Greenman provided an update on the <br /> situation <br /> (1) Two variance requests <br /> (a) Asked that partial supervision be allowed, providing the <br /> opportunity to continue construction upon the <br /> unplanned absence of the official supervisor by an <br /> on-site Professional Engineer <br /> (b) Asked for a variance from the chlorination request. <br /> b) Mr. Sanchez stated he has worked on this project, so he would recuse <br /> himself from the vote. <br /> c) Discussion regarding the construction plan and how this differs from <br /> previous variances accepted or denied from the Board <br /> d) Mr. Ullmann motioned to direct Staff to issue the variance as <br /> requested. Todd Hunter seconded. <br /> (1) Jen Mete asked for clarification on the rules included in the <br /> variance. <br /> (2) Mr. Ullmann amended the motion to include references to Rule <br /> 15 for disinfection, Rule 10.4.12 for directional drilling, Rule <br /> 10.4.11 for a gallery well, and BOE Admin Rule 6.5 for <br /> noncontinuous supervision. <br /> (3) Mr. Sanchez abstained from the vote <br /> (4) Motion carried. <br /> 3. 319761 and 319762, Town of Greeley -Terry Ranch EB-1 and EB-2, Convert Holes <br /> Originally Constructed Under a NOI to a Production Well <br /> a) Chris Jones provided background information on the situation. <br /> b) Chase Van Alstine explained the variance request and the reasoning <br /> behind it <br /> c) Chris Sanchez asked what the water source for the owner would be if <br /> this variance were not granted. <br /> (1) Chase stated that there are other options, but cost is the main <br /> concern <br /> **strikethrough denotes item was not discussed at this meeting <br />
The URL can be used to link to this page
Your browser does not support the video tag.