My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_4386554
DWR
>
Board and Commission Meetings
>
2025
>
02
>
DWR_4386554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2025 9:19:58 AM
Creation date
2/6/2025 9:19:33 AM
Metadata
Fields
Template:
Board and Commission Meetings
Board or Commission
Board of Examiners
Document Type - Board and Commission Meetings
Meeting Document
Document Date
12/3/2024
Subject
BOE Meeting Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOE Meeting Minutes <br /> December 3, 2024 <br /> Page 5 <br /> 6. Chris Sanchez motioned to approve the variance and to direct <br /> Staff to write a letter to approve a variance to Rule 16.3 to fill <br /> the remaining portion of the well structure with grout and to <br /> deem the collapsed portion of the well properly abandoned. <br /> Robert Hillegas seconded. Motion carried. <br /> iv. 8T Ranch Monitoring Hole; Permit 36846-MH; Request to Approve Well <br /> Construction for Conversion to Production Well under Receipt No. 10037325 <br /> 1. Chris Jones presented background information <br /> 2. Discussion regarding the construction of the well and rules at the <br /> time of construction <br /> 3. John Hunyadi motioned to approve a variance to Rule 14.2.2 to <br /> convert this monitoring and observation well to a production <br /> well. Todd Hunter seconded. Motion carried. <br /> 9. Proposed Well Construction Rule Changes <br /> a. Redline <br /> i. Chris Jones presented the new redline <br /> 1. Major changes include the annular space rule following <br /> alternative number 3 presented at the last Board meeting, a <br /> requirement to grout from the top of the production zone to <br /> surface for all Type I wells, an allowance of the use of any casing <br /> at least as strong as Schedule 40, 4-inch PVC casing, and a <br /> number of other changes for clarity. <br /> 2. Chris Sanchez asked if Staff requires anything from the Board <br /> regarding the rules during this Board meeting <br /> a. Chris Jones stated that Staff is not ready to push these <br /> rules through the official process with the Secretary of <br /> State yet <br /> 3. Todd Hunter asked whether coupling and centralizers are <br /> included in the situations with annular space increases <br /> a. Chris Jones stated that they are not <br /> 4. John Hunyadi asked for clarification regarding the Type II <br /> overlain by Type II rules <br /> a. Chris Jones responded that the proposed rules would <br /> require a grout plug between the Type II aquifers, which <br /> would not extend to surface <br /> 5. Todd Hunter asked how these situations would work in the real <br /> world instead of on paper <br /> a. Discussion regarding the ease of repair/abandonment <br /> with a smaller annulus, whether coupling and centralizers <br /> should be included in the rule, and the existence or lack <br /> thereof of evidence for these inclusions in the rules. <br /> ***striket rough denotes Item was not discussed at this meeting <br />
The URL can be used to link to this page
Your browser does not support the video tag.