Laserfiche WebLink
Bowie No. 2 Mine C 1996083 TR -79 Page 3 of 6 <br />Cycle Time: <br />Scraper Loading Time: 0.90 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 6750 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm smooth, rolling, dirt /It. surfaced, watered, maintained 3.0 <br />14-1 R.,,rtP- <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Total Res <br />Altitude Ad': <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm smooth, rolling, dirt /It. surfaced, watered, maintained 3.0 <br />14-1 R.,,rtP- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.52 <br />Haul Time: 0.52 minutes <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.40 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 902.82 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />0.40 <br />minutes <br />2.42 <br />minutes <br />749.34 <br />LCY /Hour <br />2 <br />Scraper(s) <br />749.34 <br />LCY /Hour <br />749.34 <br />LCY /Hour <br />Fleet size: 1 Team(s) Total job time: 69.96 <br />Unit cost: $0.743 /LCY Total job cost: $38,958.71 <br />Hours <br />CIRCES Cost Estimating Software <br />