Laserfiche WebLink
Bowie No. 2 Mine C 1996083 TR -79 Page 4 of 6 <br />SCRAPER TEAM WORK <br />Task description: Haul Fill from Upper Mat'l Strge Area to B -Seam Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 013 State: Colorado <br />Date: 1/16/2013 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 627G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083 -013 <br />COSTShift basis: I per day <br />iption <br />Cost Breakdown: Scraner Work Team Sunnort Eouinment Maintenance Eouinment <br />Total work team cost/hour: $556.86 <br />MATERIAL OUANTITIES <br />Initial volume: 53,000 CCY <br />Loose volume: 61,745 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Swell factor: 1.165 <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$65.78 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$182.63 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$278.43 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$556.86 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $556.86 <br />MATERIAL OUANTITIES <br />Initial volume: 53,000 CCY <br />Loose volume: 61,745 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Swell factor: 1.165 <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: <br />2,900 Ibs /LCY <br />Struck Volume: <br />15.70 <br />LCY <br />Material description: <br />Decomposed rock - 50% Rock, <br />Heaped Volume: <br />22.00 <br />LCY <br />50% Earth <br />Rated Payload: <br />52,800 pounds <br />Average Volume: <br />18.85 <br />LCY <br />Payload Capacity: <br />18.21 LCY <br />Adjusted Capacity: <br />18.21 <br />LCY <br />CIRCES Cost Estimating Software <br />