My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-09_PERMIT FILE - C1996083A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-08-09_PERMIT FILE - C1996083A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:23:39 PM
Creation date
8/29/2013 8:13:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
8/9/2013
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C 1996083 TR -79 Page 2 of 6 <br />SCRAPER TEAM WORK <br />Task description: Haul Fill from Upper Mat'l Strge Area to B -Seam Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 79 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 350 State: Colorado <br />Date: 8/9/2013 County: Delta <br />User: SLB <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: C083 -350 <br />COSTShiB basis: 1 per day <br />iption <br />- Scraper: Cat 627G w/ ush- ull <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Scraper Work Team SuDnort Eauimnent Maintenance Eauinment <br />Total work team cost/hour: $556.86 <br />MATERIAL QUANTITIES <br />Initial volume: 45,000 CCY Swell factor: 1.165 <br />Loose volume: 52,425 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$65.78 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$182.63 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost /hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$278.43 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$556.86 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $556.86 <br />MATERIAL QUANTITIES <br />Initial volume: 45,000 CCY Swell factor: 1.165 <br />Loose volume: 52,425 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,900 Ibs /LCY <br />Material description: <br />Decomposed rock - 50% Rock, <br />LCY <br />50% Earth <br />Rated Payload: <br />52,800 pounds <br />Payload Capacity: <br />18.21 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.21 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.