Laserfiche WebLink
lC=GE0TECN <br />Civil, Structural & Geotechnical Engineers <br />" S ,Ooth i <br />­­ , I 1� rk Ave (X; t4 40i <br />Ph: (9/0)Z-19 68PB FAX, 09,15 <br />PROJECT Bowie Mine Gob Pile Road <br />JOB NO, 2012274-CMT <br />CLIENT Bowie Resources <br />CONTRACTOR Tribble & Sons Excavating <br />CLIENT REP. Tamme Stover <br />CONSTRUCTION ACTIVITIES: <br />FIELD OBSERVATION REPORT <br />WEATHER <br />TEMP <br />WIND <br />HUMIDITY <br />DATE 11/19/12 <br />Hl F 1 5 1 <br />DAY X I I I <br />Bright Sun <br />Clear <br />Overcast <br />Rain <br />Snow <br />X <br />To 32 <br />32.50 <br />5070 <br />70-85 <br />as up <br />X <br />Sull <br />Moderate <br />High <br />Report No- <br />X <br />7 <br />Moderate <br />tl <br />Humid <br />U <br />X <br />Arrived on-site at approximately 2:00pm, as requested by Seth Tribble, to test <br />moisture and density on Class 6 road base placed for new gob pile road. <br />Contractor is final blading and compacting roadway. I took three tests today. Tests <br />indicated conformance to project specifications. I notified Seth Tribble of test results <br />on-site. <br />CLIENT REP INITIAL HERE <br />ARRIVAL TIME 200p DEPARTURE TIME 300P TRAVEL 2 HR, MINIMUM <br />BY: Jeramy Harshman TITLE: - - Engineering Technician <br />12-274-CMT Bowie Mine Gob Pile Road.xls FOR11-19-12jh#7 <br />