Laserfiche WebLink
-IJ'GEOTECH <br />..... ----- <br />Civil, Structural & GeotechnIcal Engineers <br />�9flc)) 68?t< - i'AX <br />PROJECT Bowie Mine Gob Pile Road <br />JOB NO. 2012274-CMT <br />CLIENT Bowie Resources <br />CONTRACTOR Tribble & Sons Excavating <br />CLIENT REP. Tamme Stover <br />CONSTRUCTION ACTIVITIES: <br />FIELD OBSERVATION REPORT <br />WEATHER <br />TEMP <br />WIND <br />HUMIDITY <br />DATE _/13/12 <br />S 1-14 1 T I W I TH I F I _S I <br />DAY I I X-E-F-M <br />Bright Sun <br />Clear <br />Overcast <br />Rain <br />Snore <br />x <br />To 32 <br />32-50 <br />50-70 <br />70-85 <br />85 up <br />x <br />514r <br />Moderate I <br />High <br />Report NO. <br />I <br />x <br />6 <br />Dry I <br />—1 <br />Moderate <br />- <br />"U""' <br />1 <br />x <br />Arrived on-site at 1:00pm, as scheduled with Seth Tribble, to test moisture and density <br />on native material used for fill. <br />Contractor is placing and compacting final lift of subgrade material and will began <br />placing import material in the next two days. <br />I took two tests today. <br />REP INITIAL HERE <br />ARRIVAL TIME _ 100p DEPARTURE TIME 145P TRAVEL 2 HR. MINIMUM <br />BY; Jeramy Harshman TITLE: Engineering Technician <br />12-274-CMT Bowie Mine Gob Pile Road.xls FORII-13-12jh#6 <br />