My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-27_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2013-08-27_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:24 PM
Creation date
8/27/2013 11:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
8/27/2013
Doc Name
Certification Gob Pile #3 Haul Road
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Roads
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUCKHOR • _Mj <br />Civil, Structural & Geotechnical Engineers <br />2Y7 ;iuui'i {'arl< n•fe. • G.9rnju; C, (.:<) fa 4C1 <br />Ph : (87(1) 248 681?ii • I -AX (870) 2IA9 09,H) <br />PROJECT Bowie Mine Gob Pile Road <br />JOB NO. 2012274 -CMT <br />CLIENT Bowie Resources <br />CONTRACTOR Tribble & Sons Excavating <br />CLIENT REP. Tamme Stover <br />CONSTRUCTION ACTIVITIES: <br />FIELD OBSERVATION REPORT <br />WEATHER <br />TEMP <br />WIND <br />HUMIDITY <br />DATE 11/29/12 <br />S M T w TH r s <br />DAY X <br />Bright sun <br />Clear <br />Overcast <br />Raar <br />smrn <br />X <br />To 32 <br />32.50 <br />5070 <br />70-85 <br />85 up <br />X <br />Still <br />Moderate <br />Nigh <br />Report No. <br />X <br />8 <br />D <br />M <br />X <br />Arrived on -site at 11:00am, as requested by Seth Tribble, to test densities on <br />compacted 6" asphalt mat placed for 50t CDOT right of way on south side of Highway <br />133B. <br />Contractor was finish rolling mat at time of my arrival. I took sample from hopper of <br />lay down machine at 11:15am. I took two density tests on finished mat. Tests <br />indicated conformance to the mix design perimeters for maximum theoretical density. <br />I then transported fresh asphalt sample to Huddleston -Berry in Grand Junction for <br />testing. <br />CLIENT REP INITIAL HERE <br />ARRIVAL TIME 1100a DEPARTURE TIME 1200P TRAVEL X 2 HR. MINIMUM <br />BY: Jeramy Harshman TITLE: Engineering Technician <br />12 -274 -CMT Bowie Mine Gob Pile Road.xls FOR11- 29- 12jh #8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.