Laserfiche WebLink
BUCKHOR • _Mj <br />Civil, Structural & Geotechnical Engineers <br />2Y7 ;iuui'i {'arl< n•fe. • G.9rnju; C, (.:<) fa 4C1 <br />Ph : (87(1) 248 681?ii • I -AX (870) 2IA9 09,H) <br />PROJECT Bowie Mine Gob Pile Road <br />JOB NO. 2012274 -CMT <br />CLIENT Bowie Resources <br />CONTRACTOR Tribble & Sons Excavating <br />CLIENT REP. Tamme Stover <br />CONSTRUCTION ACTIVITIES: <br />FIELD OBSERVATION REPORT <br />WEATHER <br />TEMP <br />WIND <br />HUMIDITY <br />DATE 11/29/12 <br />S M T w TH r s <br />DAY X <br />Bright sun <br />Clear <br />Overcast <br />Raar <br />smrn <br />X <br />To 32 <br />32.50 <br />5070 <br />70-85 <br />85 up <br />X <br />Still <br />Moderate <br />Nigh <br />Report No. <br />X <br />8 <br />D <br />M <br />X <br />Arrived on -site at 11:00am, as requested by Seth Tribble, to test densities on <br />compacted 6" asphalt mat placed for 50t CDOT right of way on south side of Highway <br />133B. <br />Contractor was finish rolling mat at time of my arrival. I took sample from hopper of <br />lay down machine at 11:15am. I took two density tests on finished mat. Tests <br />indicated conformance to the mix design perimeters for maximum theoretical density. <br />I then transported fresh asphalt sample to Huddleston -Berry in Grand Junction for <br />testing. <br />CLIENT REP INITIAL HERE <br />ARRIVAL TIME 1100a DEPARTURE TIME 1200P TRAVEL X 2 HR. MINIMUM <br />BY: Jeramy Harshman TITLE: Engineering Technician <br />12 -274 -CMT Bowie Mine Gob Pile Road.xls FOR11- 29- 12jh #8 <br />