Laserfiche WebLink
` �G:E0 E <br />Civil, Structural & Geotechnicai Engineers <br />2'V Sca it; I I', -IIk Ave. iJ ;�nru: u, GU 8 E401 <br />III).: t9 ?U) P,19 F,t; ?!; - E•AI (970) 249 09,15 <br />PROJECT Bowie Mine Gob Pile Road <br />FIELD OBSERVATION REPORT <br />JOB NO. 2012274 -CMT WEATHER <br />CLIENT Bowie Resources <br />CONTRACTOR _Tribble & Sons Excavating TEMP <br />CLIENT REP. Tamme Stover <br />WIND <br />HUMIDrfY <br />CONSTRUCTION ACTIVITIES: <br />DATE 11/01/12 <br />S I M I T I WfTHI F I S <br />DAY I I I I I X <br />Bright Sun <br />pear <br />Overcast <br />Rein <br />Snow <br />X <br />To 32 <br />32.50 <br />50 -70 <br />70.65 <br />85 up <br />X <br />Still <br />Moderate <br />High <br />Report No. <br />X <br />3 <br />Dry <br />Moderate <br />Humid <br />X <br />Arrived on -site at 2:15pm, as scheduled with Seth Tribble with Tribble & Sons <br />Excavating to perform moisture - density tests on subgrade for new gob pile road. I <br />met Seth on -site. He informed me that they would be processing material the rest of <br />the day and had only planned approximately 1 fill. I took 1 test today. <br />CLIENT REP INITIAL HERE <br />ARRIVAL TIME 215p DEPARTURE TIME 230p TRAVEL 2 HR. MINIMUM <br />BY: Jeramy Harshman TITLE: Engineering Technician <br />12- 274 -CMT Bowie Mine Gob Pile Road.xls FOR11- 1- 12jh #3 <br />