Laserfiche WebLink
11-I'1 • • GEOTECW <br />Civil, Structural & Geotechnical Engineers <br />Pmk Avo Mang 0:a: CO 81401 <br />PROJECT Bowie Mine Gob Pile Road <br />JOB No. 2012274-CMT <br />CLIENT Bowie Resources <br />CONTRACTOR Tribble & Sons Excavating <br />CLIENT REP. Tamme Stover <br />CONSTRUCTION ACTIVITIES: <br />FIELD OBSERVATION REPORT <br />WEATHER <br />TEMP <br />WIND <br />HUMIDITY <br />DATE 10/31/12 <br />'H I F I S I <br />DAY X I I i I <br />Bright Sun <br />Clear <br />omcast <br />Rain <br />Snow <br />X <br />TO 32 <br />37-50 <br />50-70 <br />70-85 <br />85 up <br />X <br />Still <br />Moderate <br />High <br />Report No. <br />X <br />2 <br />01Y <br />Moderate <br />Humb <br />X <br />Arrived on-site at 12:30pm, as scheduled with Seth Tribble with Tribble & Sons <br />Excavating, to perform moisture-density tests on subgrade for new gob pile Road. <br />I met Seth on-site. I took 2 tests today. <br />CLIENT REP INITIAL HERE <br />ARRIVAL TIME 1230p DEPARTURE TIME -...145P TRAVEL 2 HR, MINIMUM <br />BY: leramv Harshman <br />12-274-CMT Bowie Mine Gob Pile Road,x1s FORI0-31-12jh#2 <br />TITLE: Engineering Technician <br />