Laserfiche WebLink
= • MOTECH <br />Civil, Structural & Geotechnical Engineers w <br />;iottill F %uk Amu,. itlUlilia):i(:, GO 'r 1101 <br />Ph.: (970) P49-668 I -Ak (9110) 1)49-0134l,, <br />PROJECT Bowie Mine Gob Pile Road <br />iFIELD OBSERVATION REPORT <br />JOB NO. 2012274 -CMT WEATHER <br />CLIENT Bowie Resources <br />CONTRACTOR Tribble & Sons Excavating TEMP <br />CLIENT REP. Tamme Stover <br />WIND <br />HUMIDITY <br />DATE 10/23/12 <br />S I M I T I W I THI F I S <br />DAY I I X <br />Sno Sun <br />t:tear <br />Overcast <br />Raln <br />Snov. <br />X <br />To 32 <br />32.50 <br />50.70 <br />70.85 <br />85 up <br />X <br />Still <br />moderate <br />Hgh <br />Report No. <br />X <br />y <br />i <br />Dry <br />Moderate <br />Humld <br />X <br />CONSTRUCTION ACTIVITIES: <br />Arrived on -site at Bowie Mine and met with Seth Tribble and collected sample No. 1 of <br />native soil to be used as subbase. We then traveled to Farnsworth Pit near Paonia and <br />collected sample No. 2 of Class 6 road base. I transported samples to the Montrose Lab <br />and logged in for testing; <br />Sample No. 1: ASTM D698, Sieve and PI <br />Sample No. 2: ASTM D1557, Sieve and PI <br />CLIENT REP INITIAL HERE <br />ARRIVAL TIME 915a DEPARTURE TIME 1015a TRAVEL 2 HR. MINIMUM <br />BY: Jeramy Harshman TITLE: Engineering Technician <br />12 -274 -GMT Bowie Mine Gob Pile Road.xls FOR10- 29- 12jh #1 <br />