My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_PERMIT FILE - C2009087
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2013-06-07_PERMIT FILE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:17 PM
Creation date
8/19/2013 9:20:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Permit File
Doc Date
6/7/2013
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 of 129 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(Ft) <br />( %) ( %) <br />( %) <br />( %) <br />(fpm) <br />Time <br />- 1.00 <br />3.00 <br />2.00 <br />1250.00 <br />1.131 <br />l <br />1250.00 <br />3 813 <br />Haul Time: <br />Return Route: <br />1.131 <br />minutes <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) ( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />1250.00 <br />1.00 <br />3.00 4.00 <br />3891 <br />0.703 <br />Loading Tool unit <br />Production 811.40 <br />Truck Unit Production <br />358.65 <br />Optimal No. of Tricks: 2 <br />Return Titre: 0.703 <br />Total Truck Cycle Time: 5.079 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Trucks) Selected Number of Trucks: <br />Adjusted hourly truck team production: 595.36 <br />Adjusted single truck/loader team production: 595.36 <br />Adjusted multiple truck/loader team production: 1,190.73 <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.550 /LCY <br />minutes <br />minutes <br />673.46 LCY/Hour <br />297.68 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 182.31 Hours <br />Total job cost: $336 „506.86 <br />CIRCES Cost Estimating Softnare <br />
The URL can be used to link to this page
Your browser does not support the video tag.