Laserfiche WebLink
Page 11 of 129 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(Ft) <br />( %) ( %) <br />( %) <br />( %) <br />(fpm) <br />Time <br />- 1.00 <br />3.00 <br />2.00 <br />1250.00 <br />1.131 <br />l <br />1250.00 <br />3 813 <br />Haul Time: <br />Return Route: <br />1.131 <br />minutes <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) ( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />1250.00 <br />1.00 <br />3.00 4.00 <br />3891 <br />0.703 <br />Loading Tool unit <br />Production 811.40 <br />Truck Unit Production <br />358.65 <br />Optimal No. of Tricks: 2 <br />Return Titre: 0.703 <br />Total Truck Cycle Time: 5.079 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Trucks) Selected Number of Trucks: <br />Adjusted hourly truck team production: 595.36 <br />Adjusted single truck/loader team production: 595.36 <br />Adjusted multiple truck/loader team production: 1,190.73 <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.550 /LCY <br />minutes <br />minutes <br />673.46 LCY/Hour <br />297.68 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 182.31 Hours <br />Total job cost: $336 „506.86 <br />CIRCES Cost Estimating Softnare <br />