Laserfiche WebLink
Truck Bed (volume) Basis: <br />Struck Volume: <br />21.60 <br />LCY <br />Heaped Volume: <br />31.70 <br />LCY <br />Average Volume: <br />26.65 <br />LCY <br />Adjusted Volume: <br />30.94 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: <br />Loading Tool Capacity <br />Rated Capacity: 9.200 <br />Bucket Fill Factor: 0.825 <br />Adjusted Capacity: 7.590 <br />Job Condition Corrections: <br />LCY (heaped) <br />Blasted rock - <br />LCY <br />30.36 LCY <br />Bucket Size Class: NA <br />blasted (75 - 90 %) 0.825 <br />Site Altitude (ft.): 6800 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />C }cle Time Elements (min.): <br />-4 <br />passes <br />Load: NA <br />Truck <br />Loader Source <br />Altitude Adj: <br />1.000 <br />1.000 (CAT HB) <br />Job Effuciencv: <br />0.830 <br />0.830 (CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />C }cle Time Elements (min.): <br />-4 <br />passes <br />Load: NA <br />Maneuver: NA <br />Dump: 0.100 <br />Minutes <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load. dump. maneuver): 0.575 <br />minutes <br />Cycle Time Factors <br />Minutes <br />Factor (min.) <br />Adjusted for site altitude: <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of tricks and loaders -0,04 <br />- 0.040 <br />(Cat H B) <br />Operation: <br />Constant operation - 0.0-_4_ <br />- 0.040 <br />(Cat HB) <br />Dump Target: <br />_ <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle Time Adjustment: <br />-0.060 <br />minutes <br />Adjusted Loader Cycle Time: <br />0.515 <br />minutes <br />Net Load Time per Trick: <br />1.645 <br />minutes <br />Truck Cvcle Time: <br />Trick Exchange Time: 0.60 <br />Truck Load Time: 1.645 <br />Truck Maneuver and Dump Time: 1.00 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Minutes <br />Adjusted for site altitude: <br />0.600 <br />Minutes <br />Minutes <br />Adjusted for site altitude: <br />1.645 <br />Minutes <br />Minutes <br />Adjusted for site altitude: <br />1.000 <br />Minutes <br />Road Condition: Firm. smooth. rolling. dirt/It. surfaced. watered. <br />