Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Remove Coal Stockpile Footprint <br />Site: Peabody Sage Creek Mine Permit Action: 2013 Midterm Review <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 2/4/2013 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Slnilt basis: IWr day <br />Page 12 of 129 <br />Permit /Job#: C2009087 <br />Abbreviation: None <br />Filename: C087 -004 <br />Trick Loader Team - Truck: Cat 769D <br />- Loader: CAT 988H <br />Support Equipment -Load Area: Cat D10T - IOSU <br />-Dump Area: Cat D10T - IOSU <br />Road Maintenance -Motor Grader: CAT 1.4M <br />-Water Truck: Water Tanker. 10.000 Gal. <br />Cost Breakdown: Truck/Loader Team Sunuort Equipment Maintenance Eauipment <br />Total work team cost/hour: $1,699.05 <br />MATERIAL QUANTITIES <br />Initial volume: 48.400 CCY Swell factor: 1.000 <br />Loose volume: 48,400 LCY <br />Source of estimated volume: Division of Reclamation. Milling & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacitv: <br />Truck Payload (weight) Basis: <br />Material weight: 1.600 <br />Description: Coal - Bituminous. Raw <br />Rated Payload: 82.000 <br />Payload Capacity: 51.25 <br />Pounds/LCY <br />Pounds <br />LCY <br />CIRCES Cost Estimating SoffiNare <br />Truck <br />Loader Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />95 100 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$41.57 <br />$82.23 <br />$99.15 <br />$99.15 <br />$37.98 <br />$52.97 <br />Operating cost/hour: <br />$93.68 <br />$111.17 <br />$183.36 <br />$183.36 <br />$16.94 <br />$29.77 <br />Ripper op. cost /hour: <br />NA <br />$0.00 <br />$0.00 <br />I $0.00 <br />$0.00 <br />$0.00 <br />Operator cost /hour: <br />$25.66 <br />$35.82 <br />$37.41 <br />$37.41 <br />$27.55 <br />$21.17 <br />Unit Subtotals: <br />$160.90 <br />$229.22 <br />$319.93 <br />$319.93 <br />$82.46 <br />$103.91 <br />Number of Units: <br />4 <br />1 <br />1 1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $872.82 <br />Support: $639.86 <br />Maint: $186.37 <br />Total work team cost/hour: $1,699.05 <br />MATERIAL QUANTITIES <br />Initial volume: 48.400 CCY Swell factor: 1.000 <br />Loose volume: 48,400 LCY <br />Source of estimated volume: Division of Reclamation. Milling & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacitv: <br />Truck Payload (weight) Basis: <br />Material weight: 1.600 <br />Description: Coal - Bituminous. Raw <br />Rated Payload: 82.000 <br />Payload Capacity: 51.25 <br />Pounds/LCY <br />Pounds <br />LCY <br />CIRCES Cost Estimating SoffiNare <br />