Laserfiche WebLink
Table 1. Phase and Parcel interim and Final Reclamation <br />Phase <br />Parcel <br />Acres <br />Interim Reclamation <br />Final Reclamation <br />I <br />1 <br />12 <br />Open space <br />Wetlands <br />I <br />2 <br />9 <br />Open space <br />Wetlands <br />I <br />3 <br />25 <br />Open space <br />Wetlands <br />I <br />4 <br />96 <br />Water storage reservoir <br />excavation <br />Water storage reservoir <br />II <br />5 <br />29 <br />O en s ace <br />Wetlands <br />II <br />6 <br />8 <br />Undisturbed <br />Reservoir bank <br />III <br />194 <br />Water storage reservoir <br />excavation <br />Water storage reservoir <br />Buffer Zone <br />75 <br />Undisturbed <br />Table 2: Seed Mix <br />Species- Variety <br />Drilled Seed Rate <br />Pis /Acre) <br />Western Wheat grass <br />4.8 <br />Sideoats Grama <br />2.7 <br />Alkali Sacaton <br />0.3 <br />Sand Dro seed <br />0.1 <br />Yellow Sweetclover <br />0.7 <br />Fourwing Saltbush <br />0.5 <br />Final reclamation as wetlands will occur at the discretion of Stonewall Springs. Topsoil and overburden <br />will be placed a maximum of three feet deep above static water. Slopes will be constructed no steeper <br />than 3H:1V foot. The area will be seeded with a wetlands species seed mix including bulrushes, sedges, <br />rushes, pondweed, smartweeds, duckweeds, spike rushes, watercress, cattail and dock as recommended <br />by Colorado Parks and Wildlife. <br />Parcel 4, the majority of Phase I, final reclamation is lined water storage reservoir. Reclamation will <br />occur in two stages: interim reclamation as water storage reservoir excavation and final reclamation as <br />reservoir construction. Interim reclamation will remove material to a false floor ranging in depth between <br />three and six feet and side slopes no steeper than 2HAV foot. This area is mined out and interim <br />reclamation is complete. Final reclamation as lined water storage reservoir will be designed and <br />constructed by qualified reservoir construction firm. <br />ASI Constructors, Inc. (ASI) will lead the design of the Stonewall Springs Reservoir, a project in a <br />design /build arrangement with a local engineering firm. This reservoir will require permitting through the <br />Office of the State Engineer. The application for a new, jurisdictional reservoir in Colorado will require the <br />following items: <br />1. Application Form <br />6. <br />Geotechnical Report <br />2. Construction Plans <br />7. <br />Design Report <br />3. Construction Specifications <br />8. <br />Instrumentation Plan <br />4. Hazard Classification Report <br />9. <br />Cost Estimate <br />5. Hydrology Report <br />10. <br />Filing Fee <br />LMO /iirromm� ee nrcal1 AIlLcernaa LEII Bess I Inn c, <br />1107 Main Street, Canon City, CO 81212 <br />www.envalternatives.com • e -mail: eai @bresnan.net <br />Phone: 719 - 275 -8951 • Fax: 719 - 275 -1715 <br />