Laserfiche WebLink
Phase II <br />Phase II is comprised of Parcels 5 and 6. As Parcel 5 is mined to a false floor ranging in depth between <br />three and six feet, mined out areas will be backfilled to a minimum of three feet above static groundwater <br />levels for interim reclamation as open space. Final reclamation is wetlands, backfilling to a maximum of <br />three feet above static groundwater levels and vegetating as described for Phase I. <br />Parcel 6 will not be mined but will be overburden stockpile area. Stockpile slopes will be constructed and <br />maintained at 3H: IV foot. Upon completion of Parcel 5 mining, if an overburden stockpile is present, it <br />will be seeded with Table 1 seed mix, mulched and crimped consistent with reclamation methods for open <br />space. <br />Phase III <br />Interim reclamation for Phase III is water storage reservoir excavation. As mining progresses from south <br />to north, naturals and reject material will be placed as a false floor ranging in depth between three and six <br />feet and side slopes no steeper than 2H:1V foot for interim reclamation. Final reclamation is lined water <br />storage reservoir with construction by qualified reservoir construction firm consistent with final reclamation <br />of Phase I, Parcel 4. <br />Please contact me directly at 719 - 275 -8951 with any questions. <br />Respectfully submitted, <br />Angela M. Bellantoni <br />Cc: John P. Ary <br />Denise Gonzales <br />Mark Morley <br />Er- /iironMn ee q all ��, \IIL�rnaLii\V /eS Ilqc„ <br />1107 Main Street, Canon City, CO 81212 <br />www.envalternatives.com • e -mail: eai @bresnan.net <br />Phone: 719 - 275 -8951 • Fax: 719 - 275 -1715 <br />