Lml <br />the VLF Phase I limits. Material generated as <br />HWY 67 embankment fill. <br />An Amec field representative observed the placer <br />(See Figure 1). A Cat D10 and a Cat D8 were utili <br />compacted each lift with a minimum of 4 passes <br />addition a Cat 330 hammer hoe was used to split <br />An Amec field representative monitored structural i <br />during all shifts. Average structural fill temperatures <br />Secondary Underdrain: <br />No work was performed on the Secondary underdr <br />A total of 1380 feet of Secondary underdrain has b <br />Primary Underdrain: <br />No work was performed on the Primary underdrain <br />A total of 1280 feet of Primary underdrain has beer <br />Temporary Underdrain: <br />Temporary underdrain pipe is installed thru the em <br />Underdrain Ponds: <br />Concrete for the underdrain Ponds are complete. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters paused operations until further notice. <br />B) Underground Workings <br />Confirmatory drilling was performed during the <br />spaced on 4( + / -) foot centers and drilled to sp <br />has been performed. <br />During this reporting period exploratory e= <br />with excavation into bedrock as remediation <br />During this reporting period remediation effort <br />No.U6173, No.U6174, No-L16175 and No.U6176. <br />depths depending on the working remediated. Tt <br />approximate planned subgrade elevation using ti <br />with the back of the CAT 330 excavator bucket. / <br />are considered remediated as specified. <br />ams <br />ral fill was transported by Cat 777 and 740 haul trucks for the <br />and compaction of structural fill for the HWY 67 embankment. <br />to push and place structural fill in 18 to 24 inch loose lifts, then <br />Method specification) using a Cat 563 smooth drum roller. In <br />in excess of 24- inches, prior to compaction efforts. <br />material temperatures placed within the Hwy 67 embankment <br />ere above 327 <br />during this reporting period. <br />completed. <br />this reporting period. <br />completed. <br />No other work occurred during this reporting period. <br />other work was performed. <br />orting period on UG Working No. U6122. All drill locations were <br />ad depth. Exploratory excavation will continue until remediation <br />was performed on UG working No. 6136. This site will continue <br />aes as specified. <br />were performed and completed on UG working No.6134, <br />>ites listed were excavated to practical refusal into rock varying <br />site for each working was then backfilled in 2 foot loose lifts to <br />onsite structural fill (excavated material) and "bucket tamped" <br />I backfill material was free of organic material, ice and snow and <br />It should be noted 4 additional unknown shallow workings were within 30 foot radius of UG working No.6176 these <br />workings have been assigned to UG working No. 6176 and have been considered remediated. <br />Q Highway 67 <br />Fill continues to be placed and compacted by <br />western downstream slope of the embankment. <br />Page 2 of 6 <br />specification. A GPS dozer was observed shaping the <br />MLE2 WE 06.29.13.doc <br />