Laserfiche WebLink
lip <br />CRIPPLE CREEK & VI�TOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignme t Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date 1 <br />Project: Squaw Gulch (VLF), Hwy 67 Realig ent 74201125N0. * * * *. * * ** 06.29.?013 <br />Location: Cripple Creek & Victor Gold Mine, olorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: P6.23.13 thru 06.29.13 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />N <br />N <br />N <br />N <br />N <br />N <br />D = Day Shift N = Night <br />Shift <br />W = Weather <br />Day <br />Ambient Temperature Ranges for reporting period: <br />Low: 42 °F — 48 °F <br />High: 71 °F — 79°F <br />Ames: Slick haul roads caused by afternoon rains shut <br />June 28`h and late afternoon on June 29`h. <br />Amec: None <br />Project Issues: Haul Road design — Projects is waiting on cc <br />design option <br />Planning: Continuing Construction activities and scheduli <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) VLF (Phase I) <br />Topsoil Stripping: <br />An Amec field representative observed topsoil beinc <br />the VLF Phase I limits. Approximately 6 inches to 2 <br />trucks were utilized to transport the topsoil North of 1 <br />Overburden removal occurred during this reporting <br />using one Cat 345 excavator and 740 haul trucl <br />overburden material was removed from the upper <br />Approximately 5 to 8 feet of material was removed, <br />Structural Fill: <br />Production drilling was performed during this re <br />locations within the planned VLF Phase I limits. <br />Weather conditions for reportingperiod _ <br />Cloud Cover: Cloudy / partly Cloudy /Clear <br />I Precipitation: Light P.M. Showers <br />i Wind: Calm to Gusts at times <br />I <br />sown structural fill haul during the early night shift; on <br />from Mine operations to proceed with <br />for VLF and HWY 67. <br />I <br />removed during this reporting period in several locations within <br />eet were removed in various locations. Cat 740 articulating haul <br />ie area 34 stockpile. <br />)eriod at the Cameron clay borrow area. Material was removed <br />Material was transported to a designated area. In addition <br />)ortion of the VLF clay borrow source using a Cat D10 dozer. <br />!xposing underlying clay seam. <br />ng period within the planned limits of the PSSA and in �several <br />Five production blasts's occurred during this repo IN period within the planned PSSA and planned VLF Phase I <br />limis. In addition "cut° material was generated as tructural fill using several Cat dozers in several locations <br />t' within <br />Page 1 of 6 MLE2 WE 06.29.13.doc <br />