�l <br />II) Storm Water Management <br />Best Management Practices (BMP) are being <br />ACTIVITIES: <br />I) Field Activities: Construction activities and obseriration of production drilling, Cut, HWY 67 embankment fill <br />placement and compaction, topsoil removal, overburen removal and field sampling were performed during this <br />reporting period as required per project specifications. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg, Limits, <br />Moisture- Density, gradations and material classification hnd identifications and material sampling were performed during <br />this reporting period as required. <br />General Proiect Items <br />Meetings and Discussions: Weekly Project Status meetin was held at 10:00am on June 25"h between CC &V, Ames and <br />Amec. Topics discussed were Safety, Schedule, Project Iss s, concems and planning. <br />CC &V Projects held a meeting between CC &V mine opera 'ons, Amec and Ames on June 26". Topics discussed were the <br />Proposed Haul Road design and concerns of needed width. Mine Operations requested some additional time for discussion. <br />On June 27th it was determined that an 80 foot wide road ca i be used and designed for construction. Amec is revising dwgs <br />to meet such criteria as discussed. <br />Summary of Concerns: None <br />CC &V. Daily updates, reporting and scheduling are some of the <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />Thorne M Clark <br />Amec Project Resident <br />Ph: 970.846.9337 <br />Approved By: <br />Page 3 of 6 <br />occurring between CC &V Projects, Amec and Ames. <br />Date: �- �i —/ <br />MLE2 WE 06.29.13.doc <br />