Laserfiche WebLink
fourth adequacy review letter was sent to Trapper on January 25, 2013. This letter identified six <br />additional items that would need to be addressed in regards to the proposed revisions to their <br />Ownership and Control information contained in section 1.2.1 of the permit. Trapper responded <br />to these concerns on February 4, 2013. <br />Revisions to the Permit <br />Minor Revisions and Technical Revisions which have been made to the Trapper Mine permit <br />since the last Permit Revision (PR6) are listed below. <br />Minor Revisions <br />Revision No. <br />MR215 <br />MR 216 <br />MR217 <br />MR218 <br />MR219 <br />Approval date Nature of revision <br />11/12/2010 Updated pages for the Permit Application Package for the <br />MT6 <br />04/04/2011 TMI updated text and tables in the permit application <br />package to clarify the water monitoring schedule. <br />09/02/2011 Placed four exploration wells in the Permit Application <br />10/26/2011 <br />01/27/2012 <br />Technical Revisions: <br />Revision No <br />TR107 <br />TR106 <br />TR108 <br />TR109 <br />TR110 <br />TR111 <br />Bond Release <br />Approval date <br />05/06/2010 <br />05/12/2010 <br />Package <br />Revised maps M12 (sheet 2), M14A, and M47A (Sheet 2). <br />These revisions are a result of a change in post- mining <br />topography in the F Pit area. <br />Revises Permit Section 4.4.1.5 to allow small parcels of <br />range site C reclamation to be included in range site AB <br />bond release blocks. <br />Nature of revision <br />Annual Reclamation Report <br />Modify the mining sequence in K -pit and to add <br />geotechnical monitoring sites. No new disturbed area is <br />proposed. <br />07/28/2011 Annual Reclamation Report <br />08/24/2012 Annual Reclamation Report <br />01/29/2013 Updates the surface water monitoring plan. <br />4/24/2013 Annual Reclamation Report <br />The Division approved a bond liability release (SL -01) on 2,511.7 acres of the Trapper permit <br />area on February 12, 1998. This was a Phase I release of liability for backfilling, grading, and <br />drainage reestablishment. It was Trapper's first bond release. A Phase 11 bond release (SL -02) <br />covering 319.5 acres of the Phase I release was approved December 20, 1999. The Division <br />Trapper Mine 9 July 9, 2013 <br />