My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-05_REVISION - M1977075
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977075
>
2013-07-05_REVISION - M1977075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:15 PM
Creation date
7/8/2013 4:17:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977075
IBM Index Class Name
REVISION
Doc Date
7/5/2013
Doc Name
CN-1 APPROVAL
From
DRMS
To
OPERATOR
Type & Sequence
CN1
Email Name
BMK
AJW
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Back fill and grade 15 acres <br />Site: Holyoke Gun Club Pit Permit Action: <br />PROJECT IDENTIFICATION <br />Task #: 001 State <br />Date: 5/10/2013 County <br />User: BMK <br />Colorado <br />Phillips <br />Agency or organization name: DRMS <br />Conversion to a 112 <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />$8.34 <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit/Job #: M1977075 <br />Abbreviation: None <br />Filename: M075 -001 <br />Total unit Cost/Hour: $213.71 <br />Total Fleet Cost/Hour: $213.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 20,592 <br />Swell factor: 1.124 <br />Loose volume: 23,137 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />491.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -5 % <br />Average site altitude: 4,231 feet <br />Material weight: 2,9001bs/LCY <br />Weight description: Sand and gravel - Dr <br />Job Condition Correction Factor <br />Source <br />Operator Skill: _ 0.750 <br />Utilization % <br />Ownership Cost/Hour: <br />$63.92 <br />Dozing method: 1.200 <br />NA <br />Operating Cost/Hour: <br />_ <br />$104.03 <br />100 <br />Ripper op. Cost/Hour: <br />$8.34 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $213.71 <br />Total Fleet Cost/Hour: $213.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 20,592 <br />Swell factor: 1.124 <br />Loose volume: 23,137 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />491.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -5 % <br />Average site altitude: 4,231 feet <br />Material weight: 2,9001bs/LCY <br />Weight description: Sand and gravel - Dr <br />Job Condition Correction Factor <br />Source <br />Operator Skill: _ 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.200 <br />(SLOT) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.