Laserfiche WebLink
Task description: Apply t <br />Site: Holyoke Gun Club Pit <br />BULLDOZER WORK <br />soil over 15 acres <br />Permit Action: Conversion to a 112 <br />PROJECT IDENTIFICATION <br />Task #: 002 State <br />Date: 5/10/2013 County <br />User: BMK <br />Colorado <br />Philli <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />_Basic Machine: Cat D8T - 8SU _ <br />Horsepower: 310 <br />Blade Type: Semi - Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit/Job #: M 1977075 <br />Abbreviation: None <br />Filename: M075 -002 <br />Total unit Cost/Hour: $213.71 <br />Total Fleet Cost/Hour: $213.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 12,100 <br />Swell factor: 1.000 <br />Loose volume: 12,100 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-10% <br />200 feet <br />491.9 LCY/hr <br />Consolidated stocknile 1.0 <br />4,231 feet <br />1,600 Ibs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />Utilization % <br />Ownership Cost/Hour: <br />$63.92 <br />Dozing method: 1.000 <br />NA <br />Operating Cost/Hour: <br />$104.03 <br />_ <br />100 <br />Ripper op. Cost/Hour: <br />$8.34 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $213.71 <br />Total Fleet Cost/Hour: $213.71 <br />MATERIAL QUANTITIES <br />Initial Volume: 12,100 <br />Swell factor: 1.000 <br />Loose volume: 12,100 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-10% <br />200 feet <br />491.9 LCY/hr <br />Consolidated stocknile 1.0 <br />4,231 feet <br />1,600 Ibs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />