My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2013-07-01_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:52 PM
Creation date
7/8/2013 1:27:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
7/1/2013
Doc Name
Proposed Decision & Findings (PR8)
From
DRMS
To
Blue Mountain Energy, Inc
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YEAR, 24 HOUR STORM EVENT. <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br />Stipulation No. 23: <br />THE APPLICANT SHALL OBTAIN RIGHTS -OF -WAY FROM BLM PRIOR TO THE <br />CONSTRUCTION OF OFF LEASE ROADS, TRANSMISSION LINES, WATER LINES AND <br />FACILITIES AND FOR THIRD PARTY FACILITIES ON THE LEASES. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No. 24: <br />COMPANY HAS NOT SUBMITTED ADEQUATE INFORMATION ON MULE DEER AND <br />ANTELOPE MIGRATION PROBLEMS THROUGH THE AREA OF DISTURBANCE. IN <br />ORDER TO DEVELOP PROPER MITIGATION PLANS FOR THE PROTECTION OF THE <br />INTEGRITY OF MIGRATION ROUTES BRIEFLY IDENTIFIED IN BLM'S FINAL EIS ON <br />THE MOON LAKE PROJECT, THE FOLLOWING STIPULATION HAS BEEN <br />DEVELOPED: THE APPLICANT MUST SUBMIT TO THE REGULATORY AUTHORITY <br />THE COMPLETE STUDY RESULTS FOR MULE DEER AND ANTELOPE MIGRATION <br />CONSIDERATIONS WITHIN 30 DAYS OF APPROVAL <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br />Stipulation No. 25: <br />DUE TO POOR WEATHER CONDITIONS THE APPLICANT'S SURVEY FOR SAGE <br />GROUSE LEK ACTIVITIES WAS UNSUCCESSFUL. A SURVEY IS BEING CONDUCTED <br />IN SPRING OF 1981 TO DETERMINE IF ANY LEKS DO OCCUR IN THE AREA TO BE <br />DISTURBED. THEREFORE, BEFORE ANY EVALUATION CAN BE INITIATED THAT <br />SURVEY MUST BE SUBMITTED. WITHIN 30 DAYS OF THE MINE PLAN APPROVAL, <br />THE APPLICANT SHALL SUBMIT TO THE REGULATORY AUTHORITY THE RESULTS <br />OF THE LEK SURVEY AND WHAT MITIGATION PROCEDURES WILL BE USED TO <br />MINIMIZE IMPACTS TO SAGE GROUSE AND THEIR HABITATS. <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br />Stipulation No. 26: <br />ADEQUATE PROTECTION FOR ACTIVE GOLDEN EAGLE NESTS ADJACENT TO THE <br />MINING SITE MUST BE PROVIDED. THEREFORE, THE FOLLOWING DESCRIBED <br />LANDS ARE CLASSIFIED AS UNSUITABLE FOR SURFACE DISTURBANCE AND <br />OCCUPANCY. PERIODIC ACTIVITY DURING THE NON - NESTING SEASON (JUNE 1 - <br />FEBRUARY 28) WITHIN THE BUFFER ZONE CAN BE APPROVED ON A CASE BY <br />CASE BASIS: FEDERAL LEASE D- 047201, T2N, R10W, 6TH PM, SEC. 3, S 1/2 SE1 /4, <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.