Laserfiche WebLink
SEC. 10, NE 1/4 NE 1/4; FEDERAL LEASE C- 02373, T2N, RI OW, 6TH PM SEC. 3, E 1/2 <br />SE /4 SW 1/4. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No. 27: <br />UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL SUBMIT <br />WITHIN 30 DAYS PLANS FOR CONSTRUCTION OF POWERLINES USING APPROVED <br />GUIDELINES FOR RAPTOR PROTECTION. <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br />Stipulation No. 28: <br />UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL COMMIT <br />WITHIN 30 DAYS TO NOT USING PERSISTENT PESTICIDES UNLESS APPROVED BY <br />THE REGULATORY AUTHORITY AND TO FENCE ANY PONDS THAT CONTAIN <br />TOXIC MATERIALS. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No.29: <br />A STATE AIR QUALITY PERMIT IS REQUIRED BEFORE CONSTRUCTION AND <br />OPERATION CAN BEGIN. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No. 30: <br />WITHIN 30 DAYS OF ACCEPTANCE OF APPROVAL OF THE MINE PLAN, THE <br />APPLICANT SHALL ENSURE THAT THEIR CULTURAL RESOURCE CONTRACTOR <br />HAS SUFFICIENTLY DOCUMENTED THE 17 'POTENTIALLY' ELIGIBLE SITES SO <br />THAT OSM MAY SUBMIT A REQUEST FOR ELIGIBILITY OR NON - ELIGIBILITY <br />CONCURRENCE FOR THESE SITES TO THE COLORADO SHPO. THE INITIAL <br />DOCUMENTATION ON THE ELIGIBILITY TEST PROGRAM MAY BE IN DRAFT FORM <br />AND CONCERN ITSELF ONLY WITH THE QUESTION OF ELIGIBILITY. A BRIEF <br />FINAL REPORT ON THE TESTING PROGRAM SHOULD BE SUBMITTED WITHIN 90 <br />DAYS. <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br />Stipulation No. 31: <br />FOLLOWING SHPO REVIEW AND CONCURRENCE WITH THE ELIGIBILITY <br />11 <br />