My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2013-07-01_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:52 PM
Creation date
7/8/2013 1:27:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
7/1/2013
Doc Name
Proposed Decision & Findings (PR8)
From
DRMS
To
Blue Mountain Energy, Inc
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEC. 10, NE 1/4 NE 1/4; FEDERAL LEASE C- 02373, T2N, RI OW, 6TH PM SEC. 3, E 1/2 <br />SE /4 SW 1/4. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No. 27: <br />UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL SUBMIT <br />WITHIN 30 DAYS PLANS FOR CONSTRUCTION OF POWERLINES USING APPROVED <br />GUIDELINES FOR RAPTOR PROTECTION. <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br />Stipulation No. 28: <br />UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL COMMIT <br />WITHIN 30 DAYS TO NOT USING PERSISTENT PESTICIDES UNLESS APPROVED BY <br />THE REGULATORY AUTHORITY AND TO FENCE ANY PONDS THAT CONTAIN <br />TOXIC MATERIALS. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No.29: <br />A STATE AIR QUALITY PERMIT IS REQUIRED BEFORE CONSTRUCTION AND <br />OPERATION CAN BEGIN. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No. 30: <br />WITHIN 30 DAYS OF ACCEPTANCE OF APPROVAL OF THE MINE PLAN, THE <br />APPLICANT SHALL ENSURE THAT THEIR CULTURAL RESOURCE CONTRACTOR <br />HAS SUFFICIENTLY DOCUMENTED THE 17 'POTENTIALLY' ELIGIBLE SITES SO <br />THAT OSM MAY SUBMIT A REQUEST FOR ELIGIBILITY OR NON - ELIGIBILITY <br />CONCURRENCE FOR THESE SITES TO THE COLORADO SHPO. THE INITIAL <br />DOCUMENTATION ON THE ELIGIBILITY TEST PROGRAM MAY BE IN DRAFT FORM <br />AND CONCERN ITSELF ONLY WITH THE QUESTION OF ELIGIBILITY. A BRIEF <br />FINAL REPORT ON THE TESTING PROGRAM SHOULD BE SUBMITTED WITHIN 90 <br />DAYS. <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br />Stipulation No. 31: <br />FOLLOWING SHPO REVIEW AND CONCURRENCE WITH THE ELIGIBILITY <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.