My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_REVISION - X200522600 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X200522600
>
2013-07-01_REVISION - X200522600 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:08 PM
Creation date
7/3/2013 9:30:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200522600
IBM Index Class Name
REVISION
Doc Date
7/1/2013
Doc Name
Proposed Decision Letter & Cost Estimate
From
DRMS
To
Northfield Partners, LLC
Type & Sequence
SL2
Email Name
ERR
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade Roads <br />Site: Northfield Project Permit Action: SL2 <br />PROJECT IDENTIFICATION <br />Task #: 003 _ State: Colorado <br />Date: 7/1/2013 County: Fremont <br />User: ERR <br />Agency or organization name: DRMS <br />Pagel of 2 <br />Permit /Job #: X200522600 <br />Abbreviation: None <br />Filename: X226 -003 <br />HOURLY EQUIPMENT COST <br />Initial Volume: <br />Basic Machine: Cat D6T <br />Swell factor: <br />_ <br />1.125 <br />Horsepower: 185 <br />381 LCY <br />Source of estimated <br />Blade Type: Semi - Universal <br />Attachment: NA_ <br />Shift Basis: 1 per <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost /Hour: <br />$30.43_ <br />NA <br />Operating Cost/Hour: <br />$57.97 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $125.81 <br />Total Fleet Cost /Hour: $125.81 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />3_39 <br />Swell factor: <br />_ <br />1.125 <br />Loose volume: <br />381 LCY <br />Source of estimated <br />volume: Division of Reclamation, Mining & Safes <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjusted hourly production: 153.6 LCY /hr <br />Materials consistency description: — Compacted fill or embankment 0.9 <br />Average push gradient: 0% _ <br />Average site altitude: 5,500 feet <br />Material weight: 2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 _ (AVG.) <br />Material consistency: _ 0.900 SCAT HB)) _ <br />Dozing method: 1.000 (GEN.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.