Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 j <br />(1 SHIFT /DAY) <br />Spoil pile: <br />0.800 <br />(SSD -AC) <br />Push gradient: <br />1.000_ <br />_(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />-- __- - - - - -- -1.000 -_ - -- <br />(CAT HB) <br />--- -_ - - -- <br />Blade type: <br />(PAT) <br />Net correction: <br />0.3890 <br />Adjusted unit production: 172.95 LCY /hr <br />Adjusted fleet production: 172.95 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.727/LCY <br />Total job time: 4.94 Hours <br />Total job cost: $621.15 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />