My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_REVISION - X200522600 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X200522600
>
2013-07-01_REVISION - X200522600 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:08 PM
Creation date
7/3/2013 9:30:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200522600
IBM Index Class Name
REVISION
Doc Date
7/1/2013
Doc Name
Proposed Decision Letter & Cost Estimate
From
DRMS
To
Northfield Partners, LLC
Type & Sequence
SL2
Email Name
ERR
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 003 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(SSD -AC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868_ <br />(CAT HB) <br />_ <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />59.75 LCY /hr <br />59.75 LCY /hr <br />Fleet size: l Dozer(s) <br />Unit cost: $2.106 /LCY <br />Total job time: <br />Total job cost: <br />6.38 Hours <br />$803.04 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.