Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 003 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(SSD -AC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868_ <br />(CAT HB) <br />_ <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />59.75 LCY /hr <br />59.75 LCY /hr <br />Fleet size: l Dozer(s) <br />Unit cost: $2.106 /LCY <br />Total job time: <br />Total job cost: <br />6.38 Hours <br />$803.04 <br />CIRCES Cost Estimating Software <br />